Similar Projects
Campus Greenhouse Steam & Condensate Line Replacement
Renovation
Sub-Bidding
$150,000 CJ est. value
Laramie, WY 82071

Northern Arapaho Business Council Industrial Park Lift Station
Demolition, New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Arapahoe, WY 82501

RFQ D/B - Design-build Services of Central High School Riske Field Track Replacement
Infrastructure
Post-Bid
$38,670 CJ est. value
Cheyenne, WY 82009

Filter Backwash Pump Replacement
Renovation
Post-Bid
$194,104 CJ est. value
Cheyenne, WY 82009

Transfer Station Lift Station Upgrade or Replacement
Renovation
Bidding
$2,000,000 CJ est. value
Cheyenne, WY 82007

Plumbing Contractor Services
Term Contract
Sub-Bidding
Cheyenne, WY 82001

Stadium Plumbing Upgrade
Alteration
Post-Bid
Casper, WY 82601

Casper Regional Landfill Leachate Force Main Extension
Infrastructure
Results
$174,038 CJ est. value
Evansville, WY 82636

Replace 4 Water Heaters at Cody Middle School (CMS)
Renovation
Design
$200,000 CJ est. value
Cody, WY 82414

Scott A Mohror
Infrastructure
Post-Bid
$330,000 CJ est. value
Jackson, WY 83001

Last Updated 12/20/2022 09:37 AM
Project Title

Sludge Management Project

Physical Address View project details and contacts
City, State (County) Arminto, WY 82630   (Natrona County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,928,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: 1 LS Mobilization/Demobilization, 1 LS Erosion and Sedimentation Control, 1 LS Videotaping, 1 LS Site Preparation/Grading, 1 LS Undercut of Unsuitable Material, 1 LS 50 ft. by 80 ft. Biosolids Storage Building, Complete, 1 Allowance Electric Company & Gas Company Relocation, 1 LS Site and Utility Relocations and Installation, 40 LF 1.25" HDPE I.P.S. DR-11 Force Main, 8 LF 6" PVC DR-18 Gravity Sewer Pipe (0'-6'), 35 LF 1" Polyethylene Service Tubing, 1 EA 6" Terminal In-Line Gravity Cleanout, 1 EA Simplex Grinder Station, 1 LS Asphalt Paving, as Shown on the Contract Documents, 1 EA Tie Into Existing 24" Influent Force Main, 1 EA Tie Into Existing Water Line, Complete, 200 LF Chain Link Fence with Walking Gates, 1 LS Moving Existing Generator, 1 LS Front End Loader, 1 EA Yard Hydrant and 10 EA Test Pit 10' x 10'.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents