Similar Projects
Last Updated | 02/23/2022 09:30 AM |
Project Title | Brodgen Hall Gymnasium Floor Structural Repairs |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, NC (New Hanover County) |
Category(s) | Education, Entertainment/Recreation |
Sub-Category(s) | Athletic Facility, Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New Hanover High School Brogden Hall Gymnasium Floor Structural Repair. The foundations under the gymnasium portion of the Brogden Hall building, as well as the concrete floor slab, require structural reinforcement / replacement. The project will involve the relocation of PME currently in the crawl space below the floor, demolition of the foundations / concrete slab as required, installation of new foundation and concrete slab, as well as new finishes as may be required after structural work is complete. Pre-Qualification due for BP-02A Demo; BP-02B Micro Piles; BP03A Concrete; BP-04A Masonry; BP-05A Structural & Misc. Steel; BP-06A Misc. Carpentry & General Trades; BP-07A Dampproofing, Waterproofing, Joint Sealants; BP-08A Doors, Frames, Hardware; BP-08B Aluminum Storefront, Glass, Glazing and Roll up Shutters; BP-09A Metal Stud Framing, Drywall, Insulation; BP-09B Painting; BP-09C Gym Flooring; BP-10A Bleachers; BP-22A Plumbing; BP-23B HVAC; BP-26A Electrical. |
||||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, Renovation, Athletic Facility, Renovation.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |