Last Updated | 12/27/2023 05:04 AM |
Project Title | Magpie & Whitetail Crossings |
Physical Address | View project details and contacts |
City, State (County) | Gorham, ND 58627 (Billings County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $3,604,300 [brand] Estimate |
Plans Available from | Agency's Affiliate - 07/28/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Award Date: Dec 26, 2023 Contract Award Number: 6982AF24C000006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: EVBUYJTMKL45 Contractor Awarded Name: KOVILIC CONSTRUCTION CO INC Contractor Awarded Address: Franklin Park, IL 60131 USA Base and All Options Value (Total Contract Value): $3,604,300.00 ND FLAP 704(1) & 795(1) TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON OCTOBER 26, 2023 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted web site The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with Billings County and U.S. Forest Service (USFS), are proposing construction of ND FLAP 704(1) and 795(1) Magpie and Whitetail Crossings, to provide safe travel and allow consistent access across Magpie Creek (Magpie Road) and Whitetail Creek (Whitetail Road). The existing routes have informal low water crossings with negligible hardened surfacing which are in poor condition and are impassable during storm events. OF THE WORK: The of this project will include the construction of structures across Magpie Creek and Whitetail Creek to allow the passage of vehicles. Work will also include roadway work for the stream crossing approaches as appropriate. The Magpie Crossing will include the replacement of the existing low water crossing with a multi-span bridge structure over Magpie Creek. It will also include adjacent roadway reconstruction leading up to the bridge structure including gravel surfacing. The Whitetail Crossing will include removal and replacement of the existing low water crossing to include an AOP precast reinforced box culvert structure including approach work; and roadway reconstruction including sight distance improvements and gravel surfacing. The crossing will straighten the roadway through this section leading up to the Whitetail Picnic Area ESTIMATED PRICE: The price range of the project work is between $2,000,000 and $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |