Similar Projects
Install Dump Probes and High Water Probes at the Boiler Bldg. 112
Term Contract
Design
Milwaukee, WI 53295

Lift and Swing Melting Furnace
Alteration
Bidding
$150,000 est. value
Whitewater, WI 53190

Boilers and Installation of Boilers
Alteration
Bidding
$300,000 est. value
Madison, WI 53705

Emergency, Maintenance, and Code Related Plumbing and Heating Repair
Term Contract
Post-Bid
WI

Hot Water Heaters
Term Contract
Post-Bid

Lakeside Cottage B Boiler Replacement
Results
Less than $232,000 est. value
Madison, WI 53704

Consolidated Fire Response Ranger Station - MEP
New Construction
Results
Less than $1,900,000 est. value
Gresham, WI

Steam Kettle Replacement
Alteration
Bidding
$208,100 est. value
Fond du Lac, WI 54937

1.5 Million BTU Boiler
Post-Bid
Prairie du Chien, WI 53821

Fire Response Ranger Station Replacement -MEP
New Construction
Results
Less than $1,800,000 est. value
Anston, WI

2nd Street Community Center Boiler Project
Alteration
Bidding
$846,000 est. value
Marshfield, WI 54449

Replace Steam Line- FCI Oxford
Post-Bid
Oxford, WI 53952

Fire Response Ranger Station Replacement Black River Falls Station-MEP
Results
Less than $2,100,000 est. value
Black River Falls, WI

Water Heaters
Term Contract
Post-Bid
Milwaukee, WI

Sherman Hall Bathrooms Remodel - MEP
Renovation
Results
Less than $2,300,000 est. value
Oshkosh, WI 54901

Reported 05/14/2022 02:30 AM
Project Title

Boiler Replacement/ Camp Williams

Physical Address View project details and contacts
City, State (County) Camp Douglas, WI   (Juneau County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $444,400 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project had an original Project number of 21A3C. This project will remove the existing five boilers located at the Camp Douglas CSMS and replace them with three high efficiency boiler systems. This will require the removal of existing boilers, piping, valving and controls, replacing them with up to date components that will be connected to the building DDC system that can be monitored and managed remotely. On March 31, 2022, the State of Wisconsin approved the project through design. A designer has not been selected.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boiler Feedwater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents