Similar Projects
14th Street - Connector to Ferguson Park (Crestview District) - City of Temple
Infrastructure
Conception
$1,800,000 est. value
Temple, TX 76501

Houston Avenue Trail - City of Temple
Infrastructure
Conception
Less than $600,000 est. value
Temple, TX 76501

BNSF Terminal Facility
New Construction, Infrastructure - 4,015 SF
Design
$2,204,200 est. value
Temple, TX 76504

Rios Plaza
New Construction, Infrastructure - 10,525 SF
Design
$1,500,000 CJ est. value
Harker Heights, TX 76548

Battalion Headquarters Building with Classrooms
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Killeen, TX 76540

Battalion Headquarters Building with Classrooms
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Killeen, TX 76540

Communication Infrastructure Upgrade
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Fort Hood, TX 76544

FM 487 - Seal Coat
Infrastructure
Sub-Bidding
$2,457,480 CJ est. value
Bartlett, TX 76511

Take 5 Oil Change
New Construction - 1,462 SF
Post-Bid
Less than $500,000 CJ est. value
Belton, TX 76513

7-Eleven
New Construction - 5,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Killeen, TX

Construction of E. Avenue H Improvements - Mesquite to Jackrabbit
Results
Nolanville, TX

Resurface Roadway
Results
$2,590,963 est. value
TX

7-Eleven
New Construction - 5,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Harker Heights, TX 76548

Take 5 Oil Change
New Construction - 1,430 SF
Construction
$800,000 est. value
Killeen, TX 76549

Hunter Rentals & Sales
New Construction, Infrastructure - 6,525 SF
Pending Verification
$700,000 CJ est. value
Killeen, TX 76541

Last Updated 08/04/2022 10:33 AM
Project Title

AMFR Service and Tire Station

Physical Address View project details and contacts
City, State (County) Harker Heights, TX 76548   (Bell County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 4 2022, this project is the final planning stage as per source, however corrections need to be made to the permits then re-submitted to the city. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established.

Details

4,080 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents