Similar Projects
West Port Phase 2
New Construction
Conception
Port Charlotte, FL 33953

West Port Phase 2
New Construction
Conception
Port Charlotte, FL 33953

Deep Creek Golf Villas
New Construction
Design
Punta Gorda, FL 33983

Kings Gate Phase 8
New Construction
Design
Port Charlotte, FL 33980

Home2 Suites / Port Charlotte
New Construction, Infrastructure - 27,738 SF
Bidding
$25,000,000 CJ est. value
Punta Gorda, FL 33983

Dorchester Street Sidewalk and Water Main Replacement
Infrastructure
Bidding
$80,000 CJ est. value
Port Charlotte, FL 33952

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

ABC Fine Wine & Spirits #144T / Port Charlotte
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Port Charlotte, FL 33952

Development and Distribution of Real Property - Bachmann Tract
Results
Port Charlotte, FL

Cons-Palmave/0908
Results
Less than $172,133 est. value
Punta Gorda, FL

Cove at West Port Phase 1A
New Construction
Construction
Port Charlotte, FL

The Hammocks at West Port - Phase 1
New Construction
Construction
$25,557,510 est. value
Port Charlotte, FL

Harpoon Harry's & Shops at Bayshore
New Construction, Infrastructure - 62,060 SF
Pending Verification
$18,000,000 CJ est. value
Port Charlotte, FL 33980

Landings at West Port Phase 2
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Port Charlotte, FL 33952

Burnt Store Village
New Construction
Conception
Punta Gorda, FL 33955

Last Updated 08/22/2022 09:02 AM
Project Title

Cove at West Port Phase 2 & 3

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL 33948   (Charlotte County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $70,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for phases 2&3 of a residential development of single family attached and detached. A more exact scope of work has not been announced including the total square footage of the project. As of June 2022, Final plat was submitted to Charlotte County May 24, 2022. The project will be heard by Board of County Commissioner for final review, date to be determined. A home builder has been selected. A construction timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 180 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents