Similar Projects
Watermain Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Hillside, IL 60162

Rebid - Replace Piping And Storm Sewer Pumps
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Chicago, IL 60640

RFP RAS Pumps 4-6 Replacement
Infrastructure
Sub-Bidding
$325,000 CJ est. value
Mokena, IL 60448

Valve Operating, Leak Detection and Location Survey
Alteration
Post-Bid
Saint Charles, IL

Webster Center Restroom
Renovation - 700 SF
Post-Bid
Peoria, IL 61605

Mechanical And Plumbing Systems Renovation
Renovation
Results
Less than $4,000,000 est. value
Normal, IL 61790

Water Softeners
Alteration
Results
$150,000 to $250,000 est. value
Pekin, IL 61554

2020 Water Main Improvements
Infrastructure
Construction
$2,706,522 CJ est. value
Heyworth, IL 61745

Suppression Line - 3560 SW Adams
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Peoria, IL 61605

Casework, Toilet Room Renovation & Exterior Patio
Renovation, Alteration
Post-Bid
Carol Stream, IL 60188

Downers Grove North HS Roofing and Plumbing
Alteration
Results
Downers Grove, IL 60515

North Palos 2022 Capital Improvements - Bid Release #2
Renovation, Alteration
Post-Bid
Hickory Hills, Palos Hills, IL 60457

Building 18 Plumbing Repairs
Alteration
Results
Jacksonville, IL

Miscellaneous Water Pipe, Valves, Fittings, And Other Accessories
Term Contract, Alteration
Post-Bid
Morton, IL

Legacy Park Concession Stand Plumbing
Alteration
Results
Manteno, IL

Last Updated 07/26/2023 11:10 AM
Project Title

2023 North Regional Interceptor Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Lombard, IL 60148   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,450,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The base bid work will consist of approximately 1,250 linear feet of pre-construction cleaning, televising, and pipelining (varying from 18"-24" diameter), restoration, and other related and incidental work. The alternate bid work consists of the rehabilitation of 5 manholes. Rehabilitation primarily includes grouting and structural lining via cementitious and epoxy coating. All bids must be submitted in a sealed envelope marked in the lower left-hand corner "SEALED BID, DO NOT OPEN; PROPOSAL OF (NAME OF BIDDER) FOR THE GLENBARD WASTEWATER AUTHORITY 2023 NORTH REGIONAL INTERCEPTOR REHABILITATION PROJECT". Any questions regarding this project can be directed to Patrick Hulsebosch, RJN Group, via email: patrick.hulsebosch@rjnmail.com, via phone: 224.425.1014

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents