Similar Projects
Barton Village Amenity Center
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Lebanon, TN 37090

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SWC 504 Winter Road Maintenance
Term Contract
Post-Bid
$1,971,195 est. value

Providence Parkway Intersection Improvements
Infrastructure
Post-Bid
Mount Juliet, TN 37122

The Sweeping and Drain Cleaning Various Interstate and State Routes
Infrastructure
Results

Drain Cleaning on Various Interstate and State Routes
Infrastructure
Results

Zaxby's / Lebanon
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Lebanon, TN 37087

Zaxby's / Lebanon
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Lebanon, TN 37087

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Traffic Signal Installation Hunters Point Pike (State Route 10/US 231 North) at Torrey Pines Lane/hunters Village Drive
Infrastructure
Bidding
$400,000 CJ est. value
Lebanon, TN 37087

Sweeping on Various Interstate and State Routes
Infrastructure
Post-Bid

The On-Call Concrete Pavement Repair at Various Locations on Various Interstate and State Routes
Infrastructure
Results

Cedar Farm Village
New Construction, Infrastructure
Pending Verification
$120,000,000 CJ est. value
Lebanon, TN 37087

Last Updated 01/04/2023 01:01 PM
Project Title

Construction of Williams Street & Baddour Parkway Water Transmission Main

Physical Address View project details and contacts
City, State (County) Lebanon, TN 37087   (Wilson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,334,255 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include the following described construction: The furnishing, installation, and testing of approximately 6,845 linear feet of 16-inch C-900 PVC water, including valves, fire hydrants, fittings, concrete thrust blocking, lump sum items, unclassified excavation, backfill, tie-ins, bores with casing pipe, restoration, pavement restoration, testing, and all other appurtenances and other work as shown on the Construction Drawings or indicated in the Contract Specifications. The City of Lebanon is an equal opportunity entity and does not discriminate on the basis of age, race, sex, national origin, religion or disability in admission to, access to, or operations of its programs, services, activities or in its hiring or employment practices. Subject to the provisions of Chapter 6 of Title 62 of the Tennessee Codes Annotated, the Contractors attention is directed to the Tennessee Codes Annotated Section 62-6-119 which states that it will be necessary for each bidder and their subcontractors to show evidence of a license before his bid will be considered and that the license number, expiration date, and that part of classification applying to the bid appear on the envelope containing the bid; otherwise the bid shall not be opened. The Proposal must not be removed from the Contract Documents with which it has been bound by the City of Lebanon, Tennessee, Utilities Department. The City of Lebanon, Tennessee, Utilities Department reserves the right to reject any Proposal for failure to comply with all requirements of the notice or of any of the Contract Documents; however, it may waive any minor defects or informalities at its discretion. The City of Lebanon, Tennessee, Utilities Department further reserves the right to reject all Proposals. Completion date: 240 Calendar Days

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents