Similar Projects
Z2da--Replace Cares Tower Flooring & Nurse Stations (541-21-202)
Design
$500,000 to $1,000,000 est. value
Cleveland, OH 44106

Removal and Replacement of Carpeting
Alteration
Bidding
North Canton, OH 44720

Gym Floor Refinishing 2020 - Screening
Term Contract
Post-Bid
Columbus, OH

Gym Floor Refinishing 2020 - Sanding
Term Contract
Post-Bid
Columbus, OH

OKI Boardroom Carpet Project
Results
Cincinnati, OH 45202

M--Tile and Grout Cleaning and Seal
Results
Cleveland, OH 44106

Repair/Replace Flooring at Various Sites
Post-Bid
Canton, OH 44702

Multi-Purpose Athletic Facility Flooring
Results
Less than $700,000 est. value
Mount Vernon, OH 43050

Thompson Game Room Floor Renovation
Post-Bid
Columbus, OH

Lavatory, Hardware, and Flooring Improvements
Results
Cincinnati, OH

VCT Flooring Improvements 2020
Post-Bid
Columbus, OH

Wooster City Schools Edgewood Middle School Re-Carpet 2020
Results
Wooster, OH 44691

Removal of Old and the Installation of New Carpet and Vinyl Coated Tile
Post-Bid
Vandalia, OH 45377

Replacement Floor - Municipal Government Complex Breakroom
Results
Piqua, OH 45356

Purchase/Install/Repair/Replace Basewide Floor Covering IDIQ
Post-Bid
Wright Patterson Air Force Base, OH

Reported 05/25/2021 12:00 AM
Project Title

Floor Treatment System

Physical Address View project details and contacts
City, State (County) North Ridgeville, OH   (Lorain County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of all labor equipment, and materials required for the replacement and surface preparation and polishing system applications as follows: Bay 1 and Side room at 2,014 sq. ft.; Bays 2, 3, 4, 5 at 5,800 sq. ft.; Truck Storage Pole Barn at 4,620 sq. ft.; To include epoxy resurfacing, urethane finish, and protective industrial polymer coating materials. Contractor will remove existing flooring and prep new flooring area with diamond grinding equipment, all surfaces to be coated and equally finished either by machine or by hand as necessary, including any low spots or surface cracks to be filled prior to the epoxy surfacing. Upon completion of new surface preparation, dust and dirt debris will be removed and cleaned and PIP 3600 EM 100% solid epoxy primer will be applied at a minimum of 8 mils to all areas being resurfaced. To follow, a PIP 3600 100% solid epoxy mortar will be applied and troweled to a smooth finish of minimum 1/4 inch. After cured, surface imperfections will be ground and filled with flexible epoxy joint sealant system as needed and the mortar will have at least one coat of 1000HB 100% solid epoxy with thickening agent of 8 mills to seal. To finish, the surfaces will be buff sanded, cleaned, and a coat of PIP UR2000 Diamondwear aliphatic, satin sheen, chemical resistant, and textured coating of of minimum warranty period of one year.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents