Similar Projects
Old Frederick Middle School Redevelopment
Renovation
Conception
$62,000,000 est. value
Winchester, VA 22601

Seminary Road Redevelopment
New Construction
Conception
Alexandria, VA 22304

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Richmond Coliseum Redevelopment
New Construction, Demolition - 280,000 SF
Design
$245,000,000 est. value
Richmond, VA 23219

North Columbus Street Multifamily Development
New Construction - 75,188 SF
Conception
Alexandria, VA 22314

Canterbury On The Bay
New Construction
Design
$25,000,000 est. value
Virginia Beach, VA

West on Church & Main Street Units
Renovation - 101,773 SF
Conception
Lynchburg, VA 24503

BRG Scott`s Edge Oz
New Construction, Renovation - 15,000 SF
Design
Richmond, VA 23230

Bennetts Creek Commons
New Construction
Conception
Suffolk, VA 23435

Sycamore Plaza
New Construction, Build-Out - 31,800 SF
Design
Norfolk, VA 23523

Pembroke Mall Redevelopment
New Construction
Conception
$200,000,000 est. value
Virginia Beach, VA

Campbell Avenue Apartments
Renovation
Design
Lynchburg, VA 24501

The Commons
New Construction, Infrastructure
Conception
$140,000,000 CJ est. value
Chesapeake, VA 23323

University Village at Innovation Mixed-Use
New Construction
Design
$849,000,000 est. value
Woodbridge, VA 22195

Avonlea 2
New Construction - 200,000 SF
Conception
South Riding, VA

Last Updated 05/08/2023 05:07 PM
Project Title

Zeropak Apartment Adaptive Reuse - Phase 1

Physical Address View project details and contacts
City, State (County) Winchester, VA 22601   (Winchester City County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the conversion of vacant building at 536-580 N Cameron Street into affordable housing: Phase 1 will include the conversion of the existing 288,500-square-foot structure into 134 units with two parking additions on the north side Phase 2 will include the construction of an additional building with 50-60 age-restricted units Construction is expected to begin in the 4th quarter of 2023.

Details

6 Stories Above Grade, 288,500 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents