Similar Projects
Harold Washington SSA Elevator Upgrades
Bidding
$5,000,000 to $10,000,000 est. value
Chicago, IL 60661

Purchase and Delivery of LED Luminaires
Post-Bid
Carol Stream, IL 60188

Escalator, Passenger Elevator, Freight Elevator, Dumbwaiter and Wheelchair Lifts 3rd Party Inspection
Post-Bid
Chicago, IL

Water Meter Transmission Unit Replacement
Results
Streamwood, IL 60107

Oswego Pump Station Electrical Upgrades
Renovation
Results
Oswego, IL 60543

Generator
Post-Bid
Fairview Heights, IL 62208

Central Plant Replacement Phase 4
Results
Kankakee, IL 60901

2020 Lighting Maintenance
Term Contract
Post-Bid
Algonquin, IL

Willowbrook Solar
Results
Less than $150,000 est. value
Wheaton, IL 60189

Primary Cable (Material Only)
Post-Bid
Geneva, IL 60134

Maple Street Pumping Station Electrical Modifications
Renovation
Results
Des Plaines, IL 60018

Transformer & Switchgear (Material Only)
Post-Bid
Geneva, IL 60134

AC Nielsen Tennis Center LED Lighting
Results
Winnetka, IL 60093

Holiday Lighting and Decorating Services for the Mill Creek Special Service
Term Contract
Post-Bid
Geneva, IL

NEIU Replace Electric Cable, Phase 1
Results
$1,500,000 to $2,000,000 est. value
Chicago, IL 60625

Last Updated 11/05/2020 03:20 PM
Project Title

Accessibility & Elevator Upgrades - Bid Package No. 1 (Electrical)

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems, Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrades to the building's north and south elevators to meet current codes and design standards. One elevator shall remain functioning at all times requiring a phased construction to occur during 2021 summer break and 2022 summer break. The work is similar for both north and south elevators and includes MEP upgrades to elevator machine room, pit ladder, lighting, sump pump, rail slipper guides changed to roller guides, cab and cab doors and operating components, cab controls, call buttons, car position indicators and miscellaneous items including fire protection and suppression and all non-compliant code related items. Elevator 2 shall receive ADA push pad controls. The elevator cylinders for each elevator were replaced as part of a previous project and will not be included in the scope of work of this project. Schedule Phase 1 - Elevator 2 a. Phs1 Onsite Access Starts: May 31, 2021 b. Phs1 Substantial Completion: August 25, 2021 Phase 2 - Elevator 1 a. Phs2 Onsite Access Starts: May 30, 2022 b. Phs2 Substantial Completion: August 25, 2022

Details

Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Interior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents