Similar Projects
Boiler Replacement, Occupancy Based Thermostats, Air to Water Heat Pump Installation
Alteration
Bidding
$220,000 est. value
Toms River, NJ

BC-01 Emergency Boiler Repair (On-Call)
Alteration
Bidding
Toms River, NJ

J045--Annual Boiler Cleaning and Maintenance
Post-Bid
Lyons, NJ 07939

C1DA--Correct FCA D & F Deficiencies Boiler Plant
Post-Bid
$2,000,000 to $5,000,000 est. value
Lyons, NJ 07939

Boiler Upgrade at Bradley Beach Elementary School
Results
Bradley Beach, NJ 07720

Steam Trap Replacement Project at Bergen New Bridge Medical Center
Results
Paramus, NJ 07652

Boiler Replacement at Lanes Elementary School
Alteration
Bidding
Brick, NJ 08724

Boiler Maintenance Service
Post-Bid
Linwood, NJ 08221

Water Treatment - Boiler
Term Contract
Results
Sussex, NJ 07461

Inspection, Maintenance and Repair Services on Boilers and Related Building Heating Equipment
Alteration
Bidding
North Bergen, NJ

Mechanical Equipment Maintenance Service Contract at the Belhaven Middle School and the Seaview Elementary School
Post-Bid
Linwood, NJ 08221

Boiler Repair
Results
North Bergen, NJ 07047

Boiler/Burner Cleaning and Preventative Maintenance
Term Contract
Bidding
Dayton, Kendall Park, Monmouth Junction, NJ 08824

Maintenance Services for Instrumentation, Controls and Variable Speed Drives
Post-Bid
Lawrenceville, NJ

Boiler Preventative Maintenance and Repairs
Results
Atlantic City, NJ 08401

Last Updated 04/12/2022 10:33 AM
Project Title

Weishaupt Burner Conversion

Physical Address View project details and contacts
City, State (County) Glassboro, NJ   (Gloucester County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Remove existing burners (one each) from two Bryan Model RV600-S-150HP steam boilers. B. Supply and install one each for a total of two Weishaupt Model WM-G-20/2-AZMI burners and burner accessories. Substitutions are not acceptable C. Modify existing boiler front plate and refractory to accommodate new burner. D. Burners must be full modulation high turndown including linkage less controls. E. Head extensions shall be 12 inch combustion head extension. F. Supply and install remote control panel with accessories that shall include 460/3/60 motor starters, overloads, control transformers, switches, lights, alarm horn with silencing and pressure sensor. G. Install all electrical work as required. H. Supply and install mechanical piping as required including natural gas train, pilot line, and accessories. I. Supply and install variable frequency drive (VFM-200 with speed control module) on each burner. J. Variable frequency drives shall include capacity controller, analogue signal converter and speed control module. K. Vendor shall start, test, and tune for maximum efficiency and lowest emissions throughout the firing range. L. Review operation of new burners with Operating Engineers. M. Remove and dispose of all equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents