Similar Projects
7320--Refrigerator and Kitchen Equipment for New Building
Term Contract
Design
Tampa, FL 33612

Dog Park Agility Equipment
Alteration
Bidding
$256,505 est. value
FL

Equipment Purchase and Delivery for Various County
Alteration
Bidding
Tampa, FL

Various Sized Containers for Hillsborough County Fire Rescue
Post-Bid
FL

Air Compressor Replacement
Post-Bid
Tampa, FL 33605

Unit Price Marine Repairs and Improvements FY2021-2023
Term Contract
Results
Less than $1,000,000 est. value
Tampa, FL

Two Ship to Shore Container Handling Gantry Cranes
Results
Tampa, FL

Rotary Rolling Jacks for Shop Lifts
Post-Bid
$17,343 est. value
FL

Installation and Removal of Marine-Grade Pilings
Results
Tampa, FL

Air Compressor Maintenance and Repair Services
Post-Bid
Tampa, FL 33605

Walk Thru Metal Detectors (WTMD)
Results

Purchase and Delivery of Heavy Equipment for Solid Waste Department
Post-Bid
$836,000 est. value
FL

Removal and Disposal of Derelict Vessels
Results
$35,000 est. value
Riverview, FL 33578

Blower Maintenance and Repair Services
Post-Bid
Tampa, FL

PVC Fittings (Sheltered Market Solicitation)
Infrastructure
Results
Tampa, FL

Last Updated 06/08/2022 01:19 PM
Project Title

Sumitomo Cranes Tie-Downs and Pin Pockets Installation

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Dock/Pier/Marine, Equipment
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of modifying the existing crane beams at Berth 211 and Berth 213 to accommodate the new gantry crane storm tie down hardware and stowage pin pockets for the three (3) Sumitomo Cranes at PTB. The work includes select demolition consisting of removal of existing asphalt pavement and partial concrete demolition at the crane beams to facilitate new construction. New construction includes installation of H-Piles and reinforced concrete beams, and assembly and installation of pin pocket and tie down assemblies. Asphalt pavement removed for construction access is to be replaced in kind. The Berths and adjacent land area are to remain active and accessible during construction. Utilization of Berths 210 through 213 and construction sequencing need to be coordinated with PTB and the terminal Operator.

Details

Division 02 - Existing Conditions, Demolition.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists, Cranes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents