Similar Projects
Sycamore Station Apartments
New Construction - 166,257 SF
Conception
Mesa, AZ 85201

View 202 - Phase 3
New Construction
Conception
Mesa, AZ 85212

Maricopa Estates RV - Condos and Clubhouse
New Construction - 55,286 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Maricopa, AZ 85138

Boys and Girls Club Building Remodel
Addition - 6,000 SF
Design
Prescott Valley, AZ 86314

Community Center Renovation
Renovation
Bidding
Avondale, AZ 85323

Boys and Girls Club Building Remodel Project
Renovation
Bidding
Prescott Valley, AZ 86314

Birdsong - Phoenix
New Construction - 75,503 SF
Sub-Bidding
$17,000,000 est. value
Phoenix, AZ 85035

Tumbleweed Park at Magma Ranch Vistas
New Construction - 29,251 SF
Sub-Bidding
Florence, AZ 85132

Senior Kitchen Expansion Construction
Post-Bid
Show Low, AZ 85901

Construction of the Teesto Community Center Building
New Construction - 9,420 SF
Post-Bid
Winslow, AZ

Senior Center Expansion
Addition - 2,419 SF
Results
Less than $421,600 est. value
San Luis, AZ 85349

Visitor Center Tenant Improvements
Results
Marana, AZ 85653

Westin Tempe
New Construction - 306,725 SF
Construction
$95,000,000 est. value
Tempe, AZ 85280

City Creek Mixed Use Development
New Construction - 31,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Mesa, AZ 85210

Cerro Vista
New Construction
Pending Verification
Avondale, AZ 85018

Reported 09/11/2021 12:00 AM
Project Title

Remodel of Recorder and Treasurer Office Areas - Melody Lane Complex

Physical Address View project details and contacts
City, State (County) Bisbee, AZ 85603   (Cochise County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, transportation and expertise in order to accomplish the Remodel of the Recorders and Treasurer Offices at the Cochise County Melody Lane Complex located at 1415 Melody Lane, Bisbee, Az to the satisfaction of the County. Task 1 - Demolition, removal, and disposal of walls depicted in architectural plans of existing conditions. Temporarily remove and disconnect ceiling lights, HVAC ducts/registers, door/door frames, electrical wires/outlets/switches, and plumbing that may be in the way or part of the demolition plan. Task 2 - Construct new walls up the existing ceiling grid using metal studs and 5/8” sheetrock, or as specified in architectural plans. Install electrical and data boxes in accordance with architectural plans. Additional electrical boxes may be needed for future data needs (cameras), that are not depicted on the current architectural plan. These additional boxes could be assessed in the form of a change order. Wire and tie in electrical outlets and switches. Data boxes must have conduit up to the top of the ceiling grid. Tape and texture walls (texture is hawk & trowel finish look). Task 3 - Adjust fire suppression sprinkler heads to meet code (if needed) – sub-contract with County Contracted Fire Systems Contractor-A&R Fire Protection to perform this work (Keith Hemsworth – 520-308-0159). Task 4 - Remove existing carpet. Task 5 - Prep and mask off walls for painting. Primer new walls and paint the complete interior of the building using Dunn Edwards Suprema eggshell finish paint. The walls will be painted in “miner’s dust” color, while door frames will be painted in Dunn Edwards Suprema eggshell enamel finish (color = Draw Your Sword). Task 6 - Install new carpet tiles (Shaw Carpet Product); Style 59558 “Intrigue” Tile; Color 54595 “Stealth.” Use Tarkett rubber cove base Product #440146185, (48’ X 4”), “Harbour” color. Carpet should be adhered using pressure sensitive adhesive. Task 7 - Make necessary modifications to HVAC supply ducts and returns, to ensure new rooms have adequate air flow and return. Cochise County Information Technology staff will feed and wire data boxes. Task 8 - Replace damaged or needed ceiling tiles to match existing ceiling tiles. Task 9 - Clean work area prior to departure; to include dusting and vacuuming.

Details

Clubhouse/Social Club, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents