Similar Projects
Uhler Conveyance CSO Rack 27 and 29
Results
Less than $8,026,000 est. value
Akron, OH

Hazel Storage Basin CSO 10 and 11
Results
Akron, OH

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings (MBE Vendors Only)
Results

Septic System Abandonment and Tie into Public Sewer 4043 Brookside Court
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 3863 Croydon Road
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 4025 Brookside Court
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 3873 Easton Road
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 3751 Valley Drive
Results
Less than $6,000 est. value
Norton, OH 44203

North Main Street/Brandywine Drive Storm Sewer (Cemetery) Project
Results
Hudson, OH

2019 Concrete Slab Replacement and Storm Water Inlet Repairs Project
Results
Less than $485,000 est. value
Fairlawn, OH

2019 Storm Sewer Lining
Results
Hudson, OH

Indian Creek Exposed Sewers Project
Results
Less than $231,996 est. value
OH

Miscellaneous Storm Sewer Projects 2019
Results
$1,359,490 est. value
Silver Lake, Stow, OH 44224

Old School Green, 34 North Oviatt Street
Results
Hudson, OH

Fairway Storm and Sanitary Sewer Improvements
Results
Less than $1,230,802 est. value
Akron, OH 44313

Last Updated 10/03/2019 04:46 PM
Project Title

Duane Green Project CSO Rack 3

Physical Address View project details and contacts
City, State (County) Akron, OH 44308   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,604,870
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE Consists of construction of green infrastructure measures at three sites in East Akron. This project serves to collect and detain storm water in the Rack 3 drainage area to reduce combined sewer overflows. This project works in conjunction with Kelly Conveyance (CSO Rack 3) and Chittenden Green Project (CSO Rack 3) to eliminate the need for a storage basin.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents