Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

GAOA Custer Gallatin National Forest - Main Fork Rock Creek Road #2421 Reconstruction Project
Alteration
Bidding
$500,000 to $1,000,000 est. value
Red Lodge, MT

Grading, Crack Seal, Seal and Cover, Guardrail, and Pavement Markings on the Jct US 212-Northwest (S-421)
Infrastructure
Bidding
MT

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Post-Bid
MT

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Seal and Cover, Guardrail, Striping, Delineation, and Bridge Deck Crack Seal on the Beaverhead Rock
New Construction, Infrastructure
Bidding
MT

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Routing and Crack Sealing East River North Bozeman Area
Infrastructure
Bidding
Bozeman, MT 59715

Replace 2 Structures, Grading, Gravel, Pms Overlay, Sidewalk, Curb/Gutter And Guardrail On The Beaver Creek-Wibaux 1 Mile s Wibaux Project Located In Wibaux County
Infrastructure
Post-Bid
MT

Hudson Bay Divide South
Infrastructure
Results

Scrub Seal VC Hill Bozeman Area
Alteration
Bidding
Bozeman, MT

Last Updated 03/02/2022 04:44 AM
Project Title

Airport Improvements Bert Mooney Airport

Physical Address View project details and contacts
City, State (County) Butte, MT 59707   (Silver Bow County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,344,721
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Airport Improvements" to include the following: Taxiway 'C' Pavement Rehabilitation and Apron Pavement Maintenance Project has five schedule of work, and two additive alternates, generally consists of the following : Surface preparation for overlay, 11,500 ton of asphalt paving, shoulder grading, airfield light elevation adjustment, additive alternate for paved shoulder construction, pavement marking, 50,000 lf of crack seal, 65,000 sy of P-608 seal coat.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents