Similar Projects
Crab Orchard NWR-IDIQ Road & Associated Infrastructure Maintenance
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Marion, IL 62959

Saline River Farms Meat Processing Plant
New Construction, Infrastructure - 83,000 SF
Design
$40,000,000 CJ est. value
Creal Springs, IL 62922

Dunkin' / Marion
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Marion, IL 62959

Boyton Street Addition
Addition, Demolition, Infrastructure - 5,000 SF
Bidding
$900,000 CJ est. value
Marion, IL 62959

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Calcium Chloride Solution
Alteration
Results
Amboy, Harmon, Marion, Reynolds, Sublette, IL

Pavement Patching on IL 166
Infrastructure
Results
$2,000,000 est. value
Creal Springs, IL 62922

Illinois 37 Improvements - Illinois Department of Transportation
Infrastructure
Design
$1,200,000 CJ est. value
Marion, IL 62959

Hall Street Pump Station
Infrastructure
Bidding
$2,000,000 CJ est. value
Cambria, IL 62918

Overlay The Existing OC Streets, Various Surface Removal, and Provide Traffic Control
Infrastructure
Post-Bid
$400,000 est. value
Pittsburg, IL

HMA Surface Removal, Resurfacing and Patching on Old IL13
Infrastructure
Results
$2,000,000 est. value
Marion, IL 62959

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Surface Removal and HMA Surfacing on IL 13
Infrastructure
Results
$2,000,000 est. value
Marion, IL 62959

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Last Updated 08/12/2023 02:06 AM
Project Title

Resurface Pentecost Road

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $621,140 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface Pentecost Road from south of West DeYoung Street to Old Route 13, and Old Bainbridge Trail from Crab Orchard and Eqyptian Railroad to Old Route 13, and south of West DeYoung Street to Crab Orchard and Eqyptian Railroad, all within the City of Marion. the bids will be publicly opened from the iCX SecureVault Region 5 District 9 Federal Project # 2i6a(251) County(S) Williamson Key Route(S) Various Marked Route(S) Section(S) 19-00125-00-rs(City of Marion) State Job #(S) C-99-043-20 Pps #(S) 9-10627-0000 9-10627-0010 25 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 208 - Resurface Pentecost Road

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents