Similar Projects
Right of Way - SH076
Infrastructure
Conception
$1,250,000 CJ est. value
Blanchard, OK 73010

Right of Way - SH076
Infrastructure
Conception
$1,250,000 CJ est. value
Blanchard, OK 73010

Grade, Drain, Bridge and Surface - SH 24
Infrastructure
Design
$2,300,000 CJ est. value
Purcell, OK 73080

Grade, Drain, Bridge and Surface - SH 24
Infrastructure
Design
$2,300,000 CJ est. value
Purcell, OK 73080

Interchange, Grade, Drain, Surface, And Bridge
Infrastructure
Bidding
$39,000,000 CJ est. value
Purcell, OK 73080

Interchange, Grade, Drain, Surface, And Bridge
Infrastructure
Bidding
$39,000,000 CJ est. value
Purcell, OK 73080

Exterior Roadway Regrading at the New Hospital Site
Infrastructure
Post-Bid
$200,000 est. value
Purcell, OK

Starbucks #67888 / Purcell
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Purcell, OK 73080

9th Avenue Paving Improvements
Infrastructure
Results
$214,165 est. value
Purcell, OK 73080

Grade, Drain and Surface - SH 39: From 2.9 Miles West of the SH-76 Junction, Extend East Near Dibble
Infrastructure
Results
$6,388,388 est. value
Dibble, OK 73031

Right of Way - SH059
Infrastructure
Conception
$800,000 CJ est. value
Wayne, OK 73095

Utilities - SH 76
Infrastructure
Design
$500,000 CJ est. value
Blanchard, OK 73010

Water System Improvements I-35 and Sh 9 Water Line Relocation
Infrastructure
Bidding
$600,000 CJ est. value
Goldsby, OK 73093

Newcastle Animal Shelter
New Construction, Infrastructure - 4,394 SF
Post-Bid
$200,000 CJ est. value
Newcastle, OK 73065

Resurface (Asphalt) - I-35
Infrastructure
Results
$1,880,000 est. value
Goldsby, OK

Last Updated 07/12/2023 11:37 AM
Project Title

Reconstruct T-Hangars No. 8 & 9 and Construct Taxilanes

Physical Address View project details and contacts
City, State (County) Goldsby, OK 73093   (McClain County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is subject to the following requirements as referenced in the Special Provisions: o Buy American Preference (Reference 49 USC 50101) o Foreign Trade Restrictions o Davis Bacon (Reference: 2 CFR 200 Appendix II(D)) o Affirmative Action (Reference: 41 CFR part 60-4. Executive Order 11246) o Governmentwide Debarment and Suspension (Reference: 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5 DOT Suspension & Debarment Procedures & Ineligibility) o Government Requirements for Drug-free Workplace o Nonsegregated Facilities Requirement (Reference: 41 CFR 60-1.8) Sponsor, in accordance with Provisions of Title VI of Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and Regulations, hereby notifies all bidders it will affirmatively ensure any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises (DBE) will be afforded full and fair opportunity to submit bids in response to this invitation and not be discriminated against on the grounds of race, color, or national origin in consideration for an award. o Title VI Clauses for Compliance with Nondiscrimination Requirements (Source: Appendix A of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally Assisted Programs at the Federal Aviation Administration) o Title VI List of Pertinent Nondiscrimination Statues and Authorities (Source: Appendix E of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally Assisted Programs at the Federal Aviation Administration) It is the Department of Transportation (DOT) policy that DBEs, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in performance of contracts financed in whole or in part with Federal funds. This Project is subject to the following requirements as referenced in the Special Provisions: o Buy American Preference (Reference 49 USC 50101) o Foreign Trade Restrictions o Davis Bacon (Reference: 2 CFR 200 Appendix II(D)) o Affirmative Action (Reference: 41 CFR part 60-4. Executive Order 11246) o Governmentwide Debarment and Suspension (Reference: 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5 DOT Suspension & Debarment Procedures & Ineligibility) o Government Requirements for Drug-free Workplace o Nonsegregated Facilities Requirement (Reference: 41 CFR 60-1.8) Sponsor, in accordance with Provisions of Title VI of Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and Regulations, hereby notifies all bidders it will affirmatively ensure any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises (DBE) will be afforded full and fair opportunity to submit bids in response to this invitation and not be discriminated against on the grounds of race, color, or national origin in consideration for an award. o Title VI Clauses for Compliance with Nondiscrimination Requirements (Source: Appendix A of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally Assisted Programs at the Federal Aviation Administration) o Title VI List of Pertinent Nondiscrimination Statues and Authorities (Source: Appendix E of Appendix 4 of FAA Order 1400.11, Nondiscrimination in Federally Assisted Programs at the Federal Aviation Administration) It is the Department of Transportation (DOT) policy that DBEs, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in performance of contracts financed in whole or in part with Federal funds.. Attendance at Prebid Conference is MANDATORY. Bids will NOT be accepted from contractors who do NOT have a representative in attendance. No Plans, Specifications, or Bid Documents will be issued after Prebid Conference. All Bidders/Proposers must visit and inspect construction site and be familiar with site physical characteristics and conditions. For eligibility to bid this Project, contractors must be listed: o on official Bidder List by obtaining an official set of Plans and Specifications from Parkhill; AND o as an attendee of mandatory Project Prebid Conference. Bids received from contractors not meeting these requirements will be returned unopened. Each successful bidder shall furnish Performance Bond, Statutory Bond, and Defect Bond each in the amount of 100 percent of Contract. DBE contract goal of 2.16% has been established for this contract AIP Number: 3-40-0066-017-2024

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents