Last Updated | 02/27/2023 11:36 PM |
Project Title | Quillayute Sea Dike Repair |
Physical Address | View project details and contacts |
City, State (County) | La Push, WA 98350 (Clallam County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,750,750 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Award Date: Feb 27, 2023 Contract Award Number: W912DW23C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: NX9TDPGHC1L1 Contractor Awarded Name: Duwamish-Pacific Joint Venture Contractor Awarded Address: Seattle, WA 98108-3521 USA Base and All Options Value (Total Contract Value): $5,750,750.00 Amendment W912DW23B0002R0002 was added on 1 DEC 2022: The purpose of this amendment was to revise Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS. The SPECS were replaced in their entirety Construction Project:The magnitude of construction is estimated to be between $5,000,000 and $10,000,000. The resulting contract will be firm-fixed-price.The Corps of Engineers (USACE), Seattle District, proposes to conduct repair of the Sea Dike at the Federal Navigation project in Quillayute, La Push, WA. The work is anticipated to begin in the Fall of 2023 and all in-water work must be completed by 1 March 2024. The project will require approximately 6,400 tons Armor Stone (5-10 ton depending on rock density) and 4,200 tons Core Rock (2-12 inch core/baselayer). It is anticipated the work would be performed in the Fall-Winter of 2023-2024. This performance window is during the most challenging time of the storm season with extremely difficult marine and river conditions. The construction areas are fully exposed to strong and severe river and marine conditions. The Quillayute River runs very fast with lots of woody debris coming down the river. Marine conditions (tides, swells, currents, etc.) are subject to significant winter storms that hit this west coast location. Contractors should expect difficult construction conditions. In-water work window starts 1 September 2023 and ends 1 March 2024. In-water construction/placement may commence after 1 September 2023 and after award. However, depending on the award date, construction work such as procuring, transporting, and staging material can be done prior to the in-water work window. All in-water work must be completed by 1 March 2024.See the solicitation for details about bid submission and virtual bid opening. The NAICS code for this procurement is 2 37990, Other Heavy and Civil Engineering Construction, and the associated small business size standard is $39,500,000 in average annual receipts. https://piee.eb.mil/sol/xhtml/unauth/search/viewSolicitationRFP.xhtml to obtain more details.* Submit technical questions. When an answer is posted to a question, the question and answer is then available for all other bidders to review. 5) For questions about ProjNet, please contact the Call Center help desk from 8:00 AM to 5:00 PM Central Time: ProjNet Call Center numbers: 833-389-1097 and 217-367-3273 or email: staff@projnet.info *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |