Similar Projects
Harold Washington SSA Elevator Upgrades
Bidding
$5,000,000 to $10,000,000 est. value
Chicago, IL 60661

Elevator Maintenance
Bidding
Arlington Heights, IL

Escalator, Passenger Elevator, Freight Elevator, Dumbwaiter and Wheelchair Lifts 3rd Party Inspection
Post-Bid
Chicago, IL

JRTC Elevator Maintenance and Repair #J0205
Term Contract
Post-Bid
Chicago, IL

UIC - Building 975 Elevator Upgrades (School Of Public Health)
Results
Chicago, IL 60612

Elevator Modernization – Adams County Courthouse
Renovation
Results
Quincy, IL 62301

Elevators, ADA Lifts, Chair Lifts, and Portable Pool Lifts: Maintenance and Repair
Bidding
Chicago, IL

Elevator Preventive Maintenance & Services
Term Contract
Post-Bid
IL

Accessibility And Elevator Upgrades - Bid Package No. 1 (General )
Renovation
Results
Urbana, IL 61801

Argonne Bldg 362 Elevator Modifications
Bidding
Lemont, IL 60439

Elevator Equipment Preventative/Maintenance Services
Term Contract
Post-Bid
Addison, Lombard, Westmont, Wheaton, IL

Accessibility & Elevator Upgrades - Bid Package No. 1 (Electrical)
Renovation
Results
Urbana, IL 61801

Upgrade Elevators
Bidding
Less than $1,500,000 est. value
IL 60431

Elevator Inspection Services
Term Contract
Post-Bid
Chicago, IL 60606

IL Dept. of Agriculture Elevator Repair, Maintenance and Testing
Results
Springfield, IL 62702

Last Updated 12/14/2020 03:45 PM
Project Title

Modernize Elevators 1 through 4

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: The primary intent of this Construction effort is to modernize four (4) existing overhead traction elevators on the Marion campus. The elevators in question are located adjacent to the wall which separates buildings 1 and 38. There are two (2) paired elevators in building 1 (designated Elevators 1 and 2) and two (2) paired elevators in building 38 (designated Elevators 3 and 4). The Building 1 elevators were originally installed in 1971 and upgraded in 1988 when the Building 38 elevators were added. The work will include all tasks indicated or implied by the project drawings and specifications. The basic scope will consist of mechanical, electrical and communication upgrades to all elevator systems as well as upgrades to the HVAC systems which regulate the environment in the elevator machine rooms as well as upgrades to the electrical power distribution network which serves the elevator systems. Minor architectural and hazardous material mitigation activities are also part of the work scope.

Details

Division 14 - Conveying Equipment, Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents