Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Fort Randall-Sioux City 230-Kv Transmission Line, Structure 103/4, Access Ramp and Tower Erosion Repair, IA
Term Contract
Bidding
$250,000 to $500,000 est. value
Sioux City, IA

Upper Wapsipinicon WMA - Phase 6 Watershed Improvements
Infrastructure
Post-Bid
IA

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

5th Street Culvert Replacement
Alteration
Post-Bid
$186,000 est. value
Walford, IA 52351

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Middle Cedar WMA Flood Mitigation Structures
Results
$1,116,000 est. value

Sunland Drive South East South of Cottage Grove Avenue Flood Protection
Conception
$765,000 est. value
Cedar Rapids, IA 52403

Last Updated 08/24/2021 07:55 AM
Project Title

Singing Hills Boulevard and Harbor Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Sioux City, IA 51104   (Woodbury County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $95,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the intersection of Singing Hills Boulevard and Harbor Drive and includes the installation of a new storm intake, storm sewer, and paving replacement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents