Similar Projects
Reported | 10/14/2021 12:00 AM |
Project Title | New Water Reclamation Facility Project SW-2 Standby Power and Susbstation |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT 84116 (Salt Lake County) |
Category(s) | Industrial/Manufacturing, Sewer and Water |
Sub-Category(s) | Electric Substation, Fuel/Chemical Tanks and Lines, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work Package: 1. ONLY SCOPE OF WORK NOTED ON DRAWINGS AS SW-2 IS INCLUDED IN THIS CONTRACT PACKAGE. 2. Ancillary project controls and work as defined in the General Conditions and Division 01 specifications not explicitly listed below. 3. Clearing and grubbing, site preparation, asphalt and concrete demolition, and general construction area preparation. 4. Demolition and removal of existing conflicting utilities and associated utility relocations. 5. Foundation and soil preparation. 6. Installation of foundation for Electrical Substation and Standby Power structures and equipment. 7. Construction of Electrical Substation, Standby Power, and appurtenances. 8. Installation of Electrical Substation and Standby Generators equipment, components, devices, supports, structures, cables, and terminations. 9. Coordination with Rocky Mountain Power (RMP) for bringing power to the substation, connection of the substation to the new RMP feeder, and other related coordination activities. 10. Startup and commissioning activities for the Electrical Substation and the Standby Power. 11. Paving and grading and installation of site improvements associated with the Electrical Substation and the Standby Power. 12. Construction of vehicle fueling station and associated appurtenances. 13. Associated site utility works including but not limited to electrical, stormwater, sludge, waste drains, utility water, and air for the facilities included in the construction package. Please note that Sundt/PCL will be self-performing the listed scopes below. We are requesting materials bid associated with the following scopes: 1. Cast In Place Concrete 2. Structural Steel and Miscellaneous Metals Installation 3. Structural Excavation and Backfill 4. Site Grading 5. Site piping Installation Sundt/PCL will purchase and set the following equipment.: a. Fabricated Electrical House b. Facility Aboveground Diesel Fuel-Oil Storage Tanks c. Engine Generators Bids. The Project is generally described as new construction of a Water Reclamation Facility . Encourages DBE. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Electric Substation, New Construction, Sewage Treatment Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |