Similar Projects
Orange County Sheriff's Central Complex HVAC Air Handling Unit Replacement
Alteration
Bidding
$3,900,000 est. value
Orlando, FL 32804

Goldenrod Gym Chiller Replacement
Alteration
Bidding
$465,000 est. value
Winter Park, FL 32792

N041--Sources Sought Notice Install Cooling Tower Gearbox
Post-Bid
Orlando, FL

HVAC Maintenance and Small Projects
Term Contract
Post-Bid
Orlando, FL 32802

Replacement In-Kind of one (1) - Sixty (60) Ton Chiller at the Pompano Turnpike Operations Center
Results
Ocoee, FL 34761

A/C Removal ATaS Lab NAWCTSD
Results
Orlando, FL 32826

Building Management System (BMS) and Variable Air Volume (VAV) Replacement
Alteration
Bidding
Ocoee, FL

Air Duct Cleaning Services
Term Contract
Post-Bid
Orlando, FL 32827

Correction Building HVAC Unit Replacement
Results
Less than $1,456,440 est. value
Orlando, FL 32839

RBELC HVAC Server Room Renovations
Post-Bid
Orlando, FL 32800

HVAC System Replacement and Roof Replacement at the OHA Executive Office
Results
$354,545 est. value
Orlando, FL 32803

HVAC Mechanical Services
Term Contract
Post-Bid
Orlando, FL 32802

Facilities East District Building Roof and HVAC Replacement
Results
Less than $700,000 est. value
Winter Park, FL 32792

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Contractors to Replace Chiller in City Hall
Results
$100,000 est. value
Apopka, FL 32703

Last Updated 12/09/2021 02:47 AM
Project Title

Beachline Tunnel HVAC Replacement in Kind, Martin Andersen Beachline Expressway (SR 528), Milepost 6

Physical Address View project details and contacts
City, State (County) Orlando, FL 32885   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work specified under this Contract shall consist of providing all labor, materials, equipment and incidentals necessary to remove, dispose and replace-in-kind the existing heating ventilation and air conditioning (HVAC), 8.5-ton AAON package unit. The in-kind replacement package unit shall be a new 8.5-ton outdoor packaged one hundred percent (100%) outside air unit matching the existing specifications

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents