Similar Projects
Antioch Summit
New Construction, Infrastructure - 139,237 SF
Conception
$38,000,000 CJ est. value
Stone Mountain, GA 30088

Kathryn Avenue Bridge Replacement - City of Decatur
Demolition, New Construction, Infrastructure
Conception
$350,000 CJ est. value
Decatur, GA 30030

Fairfield Inn and Suites / Stone Mountain
New Construction, Infrastructure - 67,085 SF
Design
$10,000,000 CJ est. value
Stone Mountain, GA 30087

Masjid Al Taqwa Mosque
New Construction - 14,000 SF
Design
$4,500,000 CJ est. value
Doraville, GA 30360

High-Containment Continuity Laboratory, Building 28 (HCCL, B-28) - CDC Roybal Campus, Atlanta, GA
New Construction, Infrastructure - 100,000 SF
Post-Bid
$233,027,811 CJ est. value
Atlanta, GA 30329

WD Thomson Park Drainage Improvements
Infrastructure
Post-Bid
$426,462 CJ est. value
Decatur, GA 30033

Dresden Park Stream Bank Stabilization
Infrastructure
Results
$1,716,177 CJ est. value
Chamblee, GA 30341

Dresden Park Stream Bank Stabilization
Infrastructure
Results
$1,716,177 CJ est. value
Chamblee, GA 30341

Chamblee International Logistics Park
New Construction, Infrastructure - 256,000 SF
Construction
$45,000,000 CJ est. value
Atlanta, GA 30341

Chamblee International Logistics Park
New Construction, Infrastructure - 256,000 SF
Construction
$45,000,000 CJ est. value
Atlanta, GA 30341

Rock Chapel Elementary School Major Building System Replacement - DeKalb County School District
Demolition, Renovation
Pending Verification
$2,000,000 CJ est. value
Lithonia, GA 30058

PruittHealth Offices
Demolition, Infrastructure, Build-out, Renovation - 353,581 SF
Pending Verification
$42,000,000 CJ est. value
Chamblee, GA 30341

South McDonough Complete Streets - City of Decatur
Infrastructure
Conception
$800,000 CJ est. value
Decatur, GA 30030

SR 10 From SR 8 to Gwinnett County Line
Alteration
Design
$7,000,000 est. value
Stone Mountain, GA 30086

Laurel Ridge ES, Woodridge ES, Chesnut ES, and Druid Hills MS Major Building System Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$17,134,538 CJ est. value
Decatur, GA 30033

Last Updated 10/16/2023 02:01 PM
Project Title

RFP Construction Manager - Services for Modular Classrooms

Physical Address View project details and contacts
City, State (County) Decatur, GA 30033   (DeKalb County)
Category(s) Education, Heavy and Highway, Religious/Funeral
Sub-Category(s) Elementary School, Middle/Senior High School, Paving/Reconstruction, Religious Facility, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description : GLOBE Academy will be relocating grades Kindergarten - 5th grade to from their existing campus to a new campus located at the Clairmont Presbyterian Church at 1994 Clairmont Rd, Decatur, GA 30033. GLOBE Academy is in the process of purchasing two existing buildings on campus and several acres of land. Below is a brief outline of improvements and construction: The Milligan Hall ($2.5M target construction budget): Interior Improvements Relocation of partition walls Restroom Improvements Flooring, ceiling, and lighting upgrades HVAC modifications or replacement Sprinkler system (currently doesnt have one) Exterior Improvements Carpool canopy structure Brick tuck and point Minimal landscaping. Family Life Center ($2.4M target construction budget): Interior Improvements Relocation of partition walls Restroom Improvements Flooring, ceiling, and lighting upgrades HVAC modifications or replacement Carpool canopy structure Possible new elevator (currently doesnt have one). Sitework for Modular Classrooms (Target $750k construction budget): 24 Elementary school Classrooms (max 24 students per classroom) Administration, restrooms, storage Modulars are being provided by Modular Solutions under a separate contract GC responsible for all utility coordination/hookups to modulars GC responsible for sitework 10/20/23 RFIs from Construction Management Teams. 10/23/23 100% Design Development Documents Complete. Wk of 11/13/23 Interview Short-Listed Teams (these will be scheduled) 11/27/23 100% Construction Documents Complete TBD - TBD Award Construction Management Preconstruction Contract November 2024 Project Completion Target (Certificate of Occupancy) Please submit all RFIs and a pdf of your proposal by email to: Mo Nadizadeh Mo.nadizadeh@bdrpartners.com Jesse Frasier Jesse.frasier@bdrpartners.com

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Window Treatments, Casework, Specialty Casework, Religious Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents