Similar Projects
Main Street Train Station Maintenance
Term Contract
Sub-Bidding
Downers Grove, IL 60515

FY23 Sanitary Mainline, Hydrant and Valve Improvement Program
Term Contract
Sub-Bidding
Bloomingdale, IL 60108

Window Cleaning Services
Alteration
Post-Bid
Glen Ellyn, IL 60137

Supply and Servicing of Portable Restrooms
Alteration
Post-Bid
Wheaton, IL

Miscellaneous Cutting Tools & Abrasives
Term Contract
Results

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Debris and Materials Hauling
Term Contract
Sub-Bidding
Lisle, IL 60532

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Emergency/ Maintenance Electrical, Plumbing, HVAC, Pest Control and Generator Services for Municipal Buildings
Term Contract, Alteration
Results
Wood Dale, IL

Garbage Disposal Services for the Dupage Airport Authority
Term Contract
Sub-Bidding
West Chicago, IL 60185

Fuel Site and Storage Tank Inspections and Repairs
Term Contract
Post-Bid
Naperville, IL

Metal Stock for the Welding Technology Program
Term Contract
Sub-Bidding
Glen Ellyn, IL 60137

Large Diameter Water Meter Testing and Repair/Replacement Services
Term Contract
Post-Bid
Naperville, IL

Sewer Cleaning, Televising, and Root Cutting
Term Contract
Sub-Bidding
Hinsdale, IL 60521

Mosquito Abatement Services
Alteration
Post-Bid
Downers Grove, IL

Last Updated 08/26/2022 05:01 AM
Project Title

2022 Digester 4 Cleaning Contract 1

Physical Address View project details and contacts
City, State (County) Downers Grove, IL 60515   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work. Cleaning of a Wastewater Treatment Center Digester. The proposed work consists of: (1) Cleaning, dewatering removed solids, and stockpiling of dewatered solids onsite at the wastewater treatment facility; and (2) Hydro-jetting of two internal sludge discharge lines to clear blockages. Digester is 80' diameter and 27'8" sidewalls with a 9' deep cone. The anticipated cleaning volume is 250,000 gallons. Wages. Not less than the prevailing rate of wages as determined by the Department of Labor or determined by the court on review shall be paid to all laborers, workmen and mechanics performing work under this contract. Taxes. The Downers Grove Sanitary District is exempt from the Illinois State, Municipal or County Retailers Occupation Tax, Service Occupation Tax, Use Tax, and Service Use Tax as described in the Illinois Compiled Statute, Chapter 35. Bid prices shall not have the cost of such taxes. Bonds. All bids shall be accompanied by a bid bond, bank draft, certified check, or cashier's check payable to the Downers Grove Sanitary District for an amount not less than ten percent (10%) of the total amount of the bid provided in the Bidder Instructions. The successful bidder will be required to furnish Performance and Payment Bonds on the form provided in the Specifications, each in the amount equal to one hundred percent (100%) of the contract price. Rejection of Proposals. The Board of Trustees reserves the right to reject any and all bids and to waive technicalities. Unless the Bids are rejected for good cause, award of contract shall be made to the lowest responsible and responsive Bidder.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents