Similar Projects
Design Services for South Boulder Road at-Grade Crossing Improvements
Design
Boulder, Louisville, CO 80301

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Eisenhower/Johnson Memorial Tunnel Drainage, Plumbing, Heat Trace
Infrastructure
Bidding
Less than $19,000,000 est. value

Z--MATOC - IMR Bridges
New Construction
Bidding
$10,000,000 est. value

RFQ/CFE Oerman-Roche Trailhead Art/Design Project
Post-Bid
Superior, CO

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

C--CO, AZ and NM A/E Professional Services IDIQ
Results
$2,500 to $5,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Chey-Maint - 2021
Construction
Less than $1,261,000 est. value
Boulder, CO 80303

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Full Service Design IDIQ
New Construction
Design

Erie Downtown Infrastructure Improvements Design
Infrastructure
Bidding
Erie, CO

Consulting Services - Geotechnical Engineering and Materials Testing
Post-Bid
Boulder, CO 80304

A/E Fire Protection Engineering IDIQ
Results

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Last Updated 02/17/2022 01:45 AM
Project Title

Heil Valley Ranch Trail Bridges Engineering/Design Services

Physical Address View project details and contacts
City, State (County) CO   (Boulder County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Bridge, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking proposals for engineering/design services for two (2) trail bridges located on the Heil Valley Ranch Open Space Property. The bridges are replacements for the trail bridges that were destroyed in the 2020 Calwood Fire. The bridges provide access to the trail system crossing over Plumley Creek. The bridge sites are located at Heil Valley Ranch main trailhead, 1188 Geer Canyon Drive north of Boulder, Colorado. The two (2) bridges destroyed in the fire were: 1. an eight (8) foot wide by forty-one (41) foot long and 2. a four (4) foot wide by forty-seven (47) foot long

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents