Similar Projects
SB North 42nd Street Right Turn Lane
Post-Bid
Mount Vernon, IL 62864

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

0.9 Miles of Patching, Milling and Resurfacing on IL 15 From West of Sparrow Lane (West of i-57) yo West of Davidson Avenue
Results
Mount Vernon, IL 62864

Replacing Diaphragms on Sn 041-0039 Carrying Il 37 over Southern Railroad
Infrastructure
Results

Road Improvements
Infrastructure
Post-Bid
Ina, IL

Patching on i-64 from the Washington County Line to the i-57 / i-64 Tri-Level, North of Mt. Vernon
Infrastructure
Results
IL

Bituminous Materials
Infrastructure
Post-Bid
Woodlawn, IL

Patching on IL 15 in Mount Vernon from Zachery Street to 44th Street
Infrastructure
Results
Mount Vernon, IL 62864

Road Materials - HMA and Prime Coat
Infrastructure
Post-Bid
Mount Vernon, IL

Zadok Casey Middle School Parking Lot Improvements
Infrastructure
Results
Less than $125,000 est. value
Mount Vernon, IL 62864

Bituminous Material & Aggregate
Infrastructure
Post-Bid
Nason, IL

Resurfacing and Aggregate Shoulders on East Divide Road From Harmony Lane to Papertown Lane
Infrastructure
Results
IL

Bituminous Material & Aggregate
Infrastructure
Post-Bid
Belle Rive, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Bituminous Material & Aggregate
Infrastructure
Post-Bid
Ina, IL

Reported 06/30/2022 12:00 AM
Project Title

Shiloh Drive Reconstruction

Physical Address View project details and contacts
City, State (County) Mount Vernon, IL 62864   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $780,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of reconstructing the existing 2-lane asphalt pavement as a 2-lane concrete pavement road. Work consists of removing existing pavement and subgrade, with minor curb and gutter replacement, Portland cement concrete pavement, and all other miscellaneous work as necessary to complete the improvements for Shiloh Drive from the north entrance of Magaum Steel Works to the north of the Beelman Ready-Mix entrance as shown on the plans,

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents