Similar Projects
Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Conception
$50,000,000 est. value
Seward, AK 99664

China Poot Bay Lodge and Restaurant / Homer
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Homer, AK 99603

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

North Road Surfacing
Infrastructure
Results
Kenai, Seldovia, AK 99669

Nanwalek-Port Graham Airport Relocation Drilling Services
Term Contract, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

RFP Engineering - Dixon Diversion Project Engineering Services
Infrastructure
Conception
$1,000,000 CJ est. value
Homer, AK 99603

Sterling Highway Mp 45-60 Sunrise to Skilak Lake Rd Reconstruction CM/GC
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
AK

Gravel Road Design - Duke Street, St. Andrews Road; Sports Lake Road; Hakala Drive; Cotman Court
Infrastructure
Results
$86,011 est. value
Soldotna, AK 99669

Summer and Winter Road Maintenance - South Region, Units 3, 4, 7, 8 and 9
Term Contract
Post-Bid
Soldotna, AK

Basargin Road Phase 3 Design
Infrastructure
Results
English Bay, Soldotna, AK 99669

Summer and Winter Road Maintenance - West Region, Units 4, 5 and 6
Infrastructure
Post-Bid
Soldotna, AK

Permanent Repairs to Damage from the November 30, 2018 Earthquake
Infrastructure
Results

Summer and Winter Maintenance - Central Region Units 1, 2, 4 and 10
Infrastructure
Post-Bid
Soldotna, AK

Rehabilitate the Seward Highway from Mp 17 to 22.5
Infrastructure
Results
$60,000,000 to $70,000,000 est. value
Seward, AK

Last Updated 08/16/2022 08:38 AM
Project Title

Russian River Campground Access Phase 2

Physical Address View project details and contacts
City, State (County) Cooper Landing, AK 99572   (Kenai Peninsula County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $11,392,762 [brand] Estimate
Plans Available from Geotechnical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Aug 04, 2022 Contract Award Number: 69056722C000022 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Y25HZA5U1PM3 Contractor Awarded Name: QAYAQ CONSTRUCTION, LLC Contractor Awarded Address: Anchorage, AK 99518-1550 USA Base and All Options Value (Total Contract Value): $11392762.00 The Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract for Maintenance Dredging, Delaware River and the Fairless Turning Basin, Philadelphia to Trenton Project. Description of Work: Contract work consists of maintenance dredging of approximately 500,000 cubic yards of sediment within the Delaware River, Philadelphia to Trenton main navigation channel between the Turnpike Bridge (Sta 97+000) and just North of the Fairless Turning Basin (Sta 123+700) as well as within the Basin. There will be an Option to dredge just above the basin between Stations 123+700 and 124+700. Work includes hydraulic dredging with placement of the dredged material into the Biles Island Disposal Area in Falls Township, Pennsylvania. The base contract dredging in the Delaware River as well as within Fairless Turning Basin, will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth. The Option, if awarded will include dredging only to a depth of 25' MLLW plus 1' allowable overdepth. The base contract period of performance is 120 calendar days from the Notice to Proceed (NTP) with an additional 30 days added if Option 1 is awarded. Contractor must be prepared to commence actual dredging within ten (10) days of the Notice to Proceed (NTP). All dredging in the river must be completed between 1 July and 31 December and between 1 July and 15 March in the Basin due to environmental restrictions. Submit questions via e-mail at wfl.plans-spec@dot.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. General Location. The project work is located 30 miles east of Sterling in Kenai Peninsula Borough, Alaska. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are N 2367911.3255, E 1650767.5176. FS CNF 1015(2)

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents