Similar Projects
Pipe and Catch Basin Components
Infrastructure
Bidding
Manchester, CT

Septic System Replacement
Post-Bid
Less than $75,000 est. value
Manchester, CT 06040

Annual Catch Basin Cleaning Services
Term Contract
Post-Bid
Berlin, CT

Water and Sewer Service Replacement
Results
$100,000 est. value
New Britain, CT 06053

AFFF Valve Installation (TASM-G)
Results
$110,000 to $120,000 est. value
Hartford, CT 06105

Waterworks and Sewerage Supplies
Post-Bid
Manchester, CT

Phase II - Chapel Road Sewer Improvements Project
Results
$1,300,000 to $1,500,000 est. value
South Windsor, CT 06074

Sewer Line Repair
Post-Bid
Windsor, CT 06095

Plymouth Lane Water Main and Sanitary Sewer Replacement
Results
$850,000 est. value
Manchester, CT

Single Family Home Rehabilitation
Post-Bid
Windsor, CT

Annual Requirements for Manhole Riser Rings, Frames, and Covers
Term Contract
Results
Bristol, CT

Storm Drainage Repair
Infrastructure
Post-Bid
$440,000 to $530,000 est. value
East Hartford, CT

Non-Excavated Sewer Rehabilitation Services
Results
Bristol, CT

Woodland Street Sewer Replacment Project
Infrastructure
Post-Bid
Simsbury, CT 06070

Pipe and Catch Basin Components
Term Contract
Results
Manchester, CT

Reported 03/02/2022 12:00 AM
Project Title

Storm Drainage and Sanitary Sewer Rehabilitation at Various Locations

Physical Address View project details and contacts
City, State (County) Glastonbury, CT 06033   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary sewer improvements on Addison Road are being funded from a separate Town account and costs associated with this work must be tracked separately. As such, two separate purchase orders will be issued to the selected contractor. One purchase order will cover all of the improvements at the Addison Road work area (work area 1 above), and the second purchase order will cover all of the remaining contracted work (work areas 2 through 12 above) in order to allow the costs to be tracked and invoiced separately. Storm drainage rehabilitation improvements located on the various streets outlined within this contract are being performed in preparation for milling and paving work to be completed by others under a separate contract. Completion date described under Section 11 is required in order to meet paving schedules obligated under these other contracts. Contractor shall be prepared to mobilize all resources necessary to comply with the completion date stipulated. This Contract includes storm and sanitary sewer rehabilitation work at 12 locations within the Town of Glastonbury. Detailed construction plans are provided for work at the following four (4) locations: 1. Addison Road (PW-2119) 2. Cedar Ridge Terrace (PW-2124) 3. Concord, Medford & Melrose Street (PW-2106) 4. Naubuc Avenue (PW-2118 & PW-2713) Detailed construction plans are not provided for Catch Basin Rehabilitation work at the following eight (8) locations: 5. Aspen Drive 6. High Wood Drive 7. Liberty Drive 8. Summit Crest Drive 9. Brentwood Drive 10. Partridge Landing 11. Pheasant Crossing 12. and Fieldstone Drive

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents