Similar Projects
Lake Wilson Road Widening
Infrastructure
Bidding
$16,455,667 est. value
Champions Gate, FL 33896

Drainage -Suntrax Visual Barrier from Polk Parkway (SR570)
Infrastructure
Bidding
$5,295,637 est. value
FL

Annual Cape Seal Treatments for Public Works Construction and Maintenance
Term Contract
Post-Bid
Lakeland, FL 33801

Flexible Delineator Post
Term Contract
Post-Bid

FY 2020-21 Race Road Paving Project
Results
Dundee, FL

Main Street Pathways from Interlachen Parkway to Longfellow Boulevard
Results
Lakeland, FL 33801

SR 17 - Milling and Resurfacing
Infrastructure
Bidding
$1,046,440 est. value
FL

Tenoroc Public Use Area Road/Parking Maintenance
Post-Bid
Lakeland, FL 33805

Avenue C, SW Complete Street Project
Results
$1,419,000 est. value
Winter Haven, FL 33880

Long line Striping, Thermoplastic Removal
Infrastructure
Bidding
$317,111 est. value
FL

2021 Pavement Resurfacing Project
Post-Bid
Winter Haven, FL

South Lake Silver Drive Complete Street Project
Results
Winter Haven, FL 33881

Guardrail Repair
Infrastructure
Bidding
$85,045 est. value
FL

Tenoroc (Road Drainage Improvements)
Post-Bid
$200,000 est. value
Lakeland, FL 33805

North Wabash Avenue Extension (from Crutchfield Road to Fairbanks Street)
Results
Lakeland, FL 33815

Last Updated 01/27/2022 12:56 AM
Project Title

Roadway Widening, Drainage, Milling and Resurfacing, Sidewalk Construction, Curb and Gutter and Signing and Pavement Markings

Physical Address View project details and contacts
City, State (County) FL   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway widening, drainage, milling and resurfacing, sidewalk construction, curb and gutter and signing and pavement markings on SR 600 (US 92) from East of SR 570 (Polk Parkway) to West of Berkley Rd in Polk County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents