Similar Projects
Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

2021 Heritage Road Improvements
Bidding
$400,000 est. value
Luxemburg, WI 54217

Asphaltic Concrete Local Road Improvement
Post-Bid
WI

Southwest Industrial Park / Clairville Road - Construction
Results
Oshkosh, WI 54904

Sewer, Water Main, and Street Construction
Post-Bid
Neenah, WI 54956

2020 Utility & Street Extensions
Results
Luxemburg, WI 54217

CTH Y Reconstruction
Post-Bid
Oshkosh, WI

SCL - Kewaunee, SCL - South City Limits Kewaunee
Results
WI

Crack Seal Program
Post-Bid
Neenah, WI

West 9th Avenue Reconstruction
Results
Oshkosh, WI 54901

Last Updated 03/15/2021 03:03 AM
Project Title

T. Algoma, Omro Road, Leonard Point Road - Brooks Lane

Physical Address View project details and contacts
City, State (County) Algoma, WI (Kewaunee, Winnebago Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 56,353 CY; Backfill Granular, 1,885 CY; Backfill Structure, 302 Ton; Base Aggregate Dense, 385,025 Ton; Breaker Run, 10,060 Ton; Concrete Masonry Culverts, 59 CY; Bar Steel Reinforcement, 3,140 Lbs; Bar Steel Reinforcement Coated, 2,550 Lbs; Marking Epoxy, 24,508 LF; Construction Staking, 53,799 LF; Construction Staking, 215 Each; Construction Staking, 2 LS; Storm Sewer Pipe, 1,886 LF 18“, 1,256 LF 42“, 2,181 LF 24“, 2,251 LF 12“, 1,080 LF 30“, 744 LF 15”, 1,364 LF 36”, 381 LF 48”; Storm Sewer Pipe Horizontal lliptical, 68 LF 14” X 23”, 810 LF 19“ X 30”, 272 LF 24“ X 38”; Pipe Arch, 15 LF 42“ X 29”; Concrete Curb, 115 LF; Concrete Curb and Gutter, 19,505 LF; ConcreteSidewalk, 83,065 SF; Asphaltic Surface, 850 Ton; HMA Pavement, 10,665 Ton; Tack Coat, 2,350 Gals; Signs, 434 SF; Concrete Driveway, 4,058 SY; Temporary Traffic Signals, 1 LS; Storm Sewer Lateral, 662 LF; Excavation, Hauling and Disposal of Contaminated Soil, 3,220 Ton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents