Similar Projects
Honoapiilani Highway Affordable Workforce Housing
New Construction, Infrastructure
Conception
$31,300,000 CJ est. value
Wailuku, HI 96793

Grand Wailea Resort Expansion
Addition, Infrastructure, Renovation
Conception
$39,900,000 CJ est. value
Wailuku, HI 96793

Seabury Hall Faculty Housing
New Construction, Infrastructure
Design
$2,250,000 CJ est. value
Makawao, HI 96768

Kula Agricultural Park Phase 2
Infrastructure
Design
$9,500,000 CJ est. value
Wailuku, HI 96793

Lower Paia Beach Parking and Interim Parking Lots
Infrastructure
Bidding
$1,000,000 CJ est. value
Paia, HI 96779

Kaunakakai Elementary School Permanent Freestanding Shade Structure
New Construction, Infrastructure
Post-Bid
$50,000 CJ est. value
Kaunakakai, HI 96748

Kamole WTP - High Lift Booster #4 Pump/motor Replacement
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Honolulu, HI 96813

Maui District Baseyard Interior Alterations And New Office Building
New Construction, Renovation, Infrastructure
Results
$3,879,000 CJ est. value
Kula, HI 96790

Maui High School - Girls Athletic Locker Room and Other Facilities
New Construction, Infrastructure
Results
$7,588,000 CJ est. value
Kahului, HI 96732

Waiehu Heights Well 1 Replacement - Exploratory
Infrastructure
Construction
$928,933 CJ est. value
Wailuku, HI 96793

Kaulana Mahina Apartments
New Construction, Infrastructure
Construction
$122,200,000 CJ est. value
Wailuku, HI 96793

Waikapu Country Town
New Construction, Infrastructure
Pending Verification
$600,000,000 CJ est. value
Wailuku, HI 96793

Honua'ula
New Construction, Infrastructure
Pending Verification
$130,000,000 CJ est. value
Wailuku, HI 96793

War Memorial Football Stadium and Track Rehabilitation - CBS-5539 - County of Maui
Infrastructure
Conception
$7,200,000 CJ est. value
Kula, HI 96790

Liloa Hale Senior Affordable Housing
New Construction, Infrastructure
Design
$32,900,000 CJ est. value
Kihei, HI 96753

Last Updated 10/18/2023 07:03 PM
Project Title

Kihei No. 3 Force Main Replacement Project

Physical Address View project details and contacts
City, State (County) Wailuku, HI 96793   (Maui County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $580,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Clarification Requests due: Tuesday, October 17, 2023 The project involves the replacement of the existing 12-inch Kihei No. 3 WWPS Force Main with approximately 2,100 linear feet of 12-inch DR18 Polyvinyl Chloride (PVC) C900 pipe, including all fittings and appurtenances; excavation and backfill; connection to the existing sewer system; restoration of existing improvements; and all other incidental work necessary to complete the project. Furnish all labor, material, equipment, and incidentals required to demolish, modify, or alter, existing facilities as shown or specified and as required for the installation of new mechanical, piping, and appurtenances. Remove and dismantle existing piping and equipment as necessary for the performance of structural and piping alterations in accordance with the requirement herein specified. Bid/offer form must be downloaded, filled out, signed, and uploaded with your bid submission, along with a bid bond. Submittals covered by these requirements include manufacturers' information, shop fabrication drawings, test procedures, test results, samples, requests for substitutions, and miscellaneous work-related submittals. Submittals shall also include, but not be limited to, all mechanical, electrical, and electronic equipment and systems, materials, reinforcing steel, fabricated items, and piping and conduit details. The Contractor shall furnish all drawings, specifications, descriptive data, certificates, samples, tests, methods, schedules, and manufacturer's installation and other instructions as specifically required in the Contract Documents to demonstrate fully that the materials and equipment to be furnished and the methods of work comply with the provisions and intent of the Contract Documents. This section specifies earthwork which consists of excavation, filling, grading, and disposal of excess material. Interested parties may contact the County Project Manager, Ms. Deborah Aweau, at (808) 876-4524 with questions about the meeting or project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents