Similar Projects
Last Updated | 09/16/2023 05:34 AM |
Project Title | White Pass Vicinity Major Drainage Phase 3B |
Physical Address | View project details and contacts |
City, State (County) | Yakima, WA 98908 (Yakima County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,432,649 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removing the existing 36" corrugated metal culvert and replacing with an eighteen-foot clear span eight-foot rise precast concrete four-sided box culvert with wing and end walls, regrading of Andy Creek and placement of streambed materials, raising the roadway profile and widening of the roadway shoulders, replacing a 30" corrugated metal culvert, placing crushed surfacing and hot mix asphalt, regrading of roadside ditches, utilities coordination, delineation; guardrail, traffic detour maintenance; roadside planting and erosion control, traffic control and other work. Involves 11 items and 45 working days. County Yakima County Estimated value $1,250,000 - $1,500,000. A state funded project. Contains a 5% condition of award Small Business Enterprise goal and a 2% condition of award Veteran Owned Business goal. Jerry Wood Project Engineer wsdotscpeosouthprebid@wsdot.wa.gov WSDOT - SR 12, White Pass Vicinity - Major Drainage Phase 3B *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |