Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

The Improvement Consists of Cleaning (Nighttime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Renewable Energy & Urban Farming Campus
New Construction - 13,000 SF
Construction
$36,000,000 est. value
Chicago, IL 60661

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

2021 Road Maintenance Program
Post-Bid
Inverness, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Street Resurfacing Program
Renovation
Post-Bid
Mount Prospect, IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Site Paving
Post-Bid
Elgin, IL 60120

Last Updated 07/25/2022 10:10 AM
Project Title

2021 CDBG Street Resurfacing Project

Physical Address View project details and contacts
City, State (County) Hazel Crest, IL 60429   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Illinois Department of Transportation pre-qualifications will be required of all bidders on this project. The Engineer has been authorized to refuse to issue plans, specifications and proposals to any person, firm, or corporation that he or she considers to be unqualified. All proposals or bids offered must be accompanied by a bid bond, cash, or certified check made payable to the Village of Hazel Crest in the amount of not less than ten percent (10%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. Prequalifications Of Bidders in accordance with Section 102.01 of the Standard Specifications will be required of all bidders on this project. No bid shall be withdrawn after the opening of the proposals without the consent of the President and the Board of Trustees of the Village of Hazel Crest for a period of forty-five (45) days after the scheduled time of closing bids. The bidder is specifically advised that the Village of Hazel Crest is a sub-grantee of the County of Cook of a grant made pursuant to the Housing and Community Development Act of 1974, pursuant to an agreement entered into and between the County of Cook and the Village of Hazel Crest. Payments to the Contractor will be made by the Village of Hazel Crest only after it has received the funds to make such payments from the County of Cook in accordance with the terms of the aforesaid agreement. Further, in compliance with the Stevens Amendment to the Department of Defense Appropriations Act of 1989, the (estimated/actual) percentage of the total cost of this project to be funded with federal dollars is (100%) and the exact dollar amount of federal funds which will be set aside for this Project will be based on the contract amount awarded under this offering. Applicable Federal Requirements All laborers and mechanics employed by the Contractor or Subcontractor on construction work for this project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act as amended (40 U.S.C. 276-276a-5), and shall receive overtime compensation in accordance with and subject to the provisions of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333), and the Contractor and Subcontractor(s) shall comply with all regulations issued pursuant to these Acts and other applicable Federal laws and regulations pertaining to labor standards. The Secretary of Labor has, with respect to the labor standards specified in this section, the authority and functions set forth in Reorganization Plan Number 14 of 1950 (5 U.S.C. 133z-15) and Section 2 of the Act of June 13, 1934, as amended (40 U.S.C. 276c). All contracts and Subgrantees for construction or repair shall include a provision for compliance with the Copeland "Anti-Kickback Act" (18 U.S.C. Section 874) as supplemented in Department of Labor Regulations (29 CFR, Part 3). Contracts shall include a provision for compliance with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor Regulations (29 CFR, Part 5). Each bidder is required to comply with Equal Employment Opportunity requirements for Community Development Block Grants, a copy of which is on file with the Village Clerk and is available for inspection. Compliance with "Section 3" which calls for affirmative action by the Contractor to train and/or hire lower income residents of the project area and to subcontract with local, small businesses is required on this project. An explanation of the Applicable Federal Requirements previously mentioned is provided in the Special Provisions section of the Bid Specifications. The successful bidder for the construction of the improvement will be required to file a performance bond equal to one hundred percent (100%) of the bid, with sureties to be approved by the President and Board of Trustees which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract; and also that the bidder and contractor shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and materials furnished. The contractor shall be required to furnish sufficient insurance or guaranty of indemnity to the Village of Hazel Crest, Illinois, and the County of Cook, Illinois, against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the President and Board of Trustees of the Village of Hazel Crest. The right to reject any and all proposals or bids is reserved.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents