Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Columbia City School HVAC Renovations Project
Renovation
Bidding
$500,000 CJ est. value
Columbia City, OR 97018

OSP Boiler Replacement Installation
Renovation
Bidding
$700,000 CJ est. value
Salem, OR 97310

Vale Elementary School HVAC Upgrade - Phase II
Renovation
Sub-Bidding
$500,000 CJ est. value
Vale, OR 97918

Douglas Hall HVAC Replacement Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Roseburg, OR 97471

HVAC Design-Build Services at Multiple Schools
Alteration
Post-Bid
Coos Bay, OR

Purchase and Replacement of the Chiller System at the Barry Fisher Building (BFB) Northwest Fisheries Science Center (MWFSC) Newport Research Station
Term Contract
Post-Bid
Newport, OR 97365

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Air Purification System For Local Buses
Alteration
Results
Salem, OR 97301

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

OSP Boiler DDC Controls
Renovation
Sub-Bidding
$650,000 CJ est. value
Salem, OR 97310

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Air Purification System For Regional Buses
Alteration
Results
Salem, OR

Last Updated 04/17/2023 05:12 PM
Project Title

WWTP Shop Building HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Lincoln City, OR 97367   (Lincoln County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $198,020 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The general nature of work, described in detail in this contract and in the basis of payment, includes furnishing all labor, equipment and materials necessary for the construction of the project. Primary items of work include: Remove and Install new 10-ton Packaged Heat Pump. Each bid proposal must be submitted on the forms prescribed by the City and accompanied by a Proposal Guaranty (certified check, cashier's check, or bid bond) in an amount equal to ten (10) percent of the total amount bid. All written questions must be received by the Dan Christian by 5 PM PST on March 7, 2023 All questions or requests for clarification shall be directed in writing to the Dan Christian, via email: dchristian@lincolncity.org, or by regular mail to Lincoln City, PO Box 50, Lincoln City, Oregon 97367. All written questions must be received by the Dan Christian 9 calendar days prior to the Bid Due date. The City will determine appropriate responses, if any, and if necessary an Addendum will be issued to all plan holders of record at least 5 calendar days prior to the Bid Due date Each bid proposal must be submitted on the forms prescribed by the City and accompanied by a Proposal Guaranty (certified check, cashier's check, or bid bond) in an amount equal to ten (10) percent of the total amount bid. The ten percent Proposal Guaranty shall be forfeited to the City if the bidder fails to enter into a contract with the City of Lincoln City within fifteen (15) days after the date of the Notice of Award. The successful bidder will be required to furnish a bond equal to one hundred percent of the amount bid for faithful performance of the Contract. PRE-BID MEETING - There will not be a pre-bid meeting or site visit conducted by the City. Any verbal response(s) obtained from any source by bidders will be considered informational and shall not be relied upon by bidders. The Contractor must comply with the provisions required by ORS 279C.800 to ORS 279C.870 (PREVAILING WAGE RATE). City may cancel this procurement or reject any bid that does not comply with all prescribed public bidding procedures and requirements, including the requirement to demonstrate the bidder's responsibility under ORS 279C.375 (3)(b) and that City may reject for good cause all bids after finding that doing so is in the public interest

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents