Similar Projects
RFP - Master Planning
Term Contract
Bidding
Elizabeth City, NC 27909

RFQ - On Call Geotechnical and Materials Testing Services
Term Contract
Bidding
High Point, NC 27260

Ultrasonic Rail Testing
Term Contract
Post-Bid
Charlotte, NC

Airport Boulevard Sidewalk Improvements Project
Post-Bid
Morrisville, NC 27560

Inspections For Construction Projects
Results
Durham, NC

Construction Inspection Services - Estes Drive Bike-Ped Improvements
Results
Chapel Hill, NC

RFP - Comprehensive Master Plan Update
Term Contract
Bidding
Hendersonville, NC 28792

I-5986C and R-5777D Construction Engineering and Inspection (CEI)
Term Contract
Post-Bid
Morehead City, NC

Engineering Report, Design and Bid Package and Inspection Services
Infrastructure
Results
Scotland Neck, NC

RFQ - Special Inspection and Material Testing Services
Term Contract
Bidding
Carrboro, NC 27510

Material Testing and Special Inspection Services
Infrastructure
Post-Bid
Charlotte, NC

Pre-REAC Inspection Services
Infrastructure
Results
Lumberton, NC

RFQ - Public Art Master Plan
Term Contract
Bidding
Mooresville, NC 28115

Aircraft Fire Training Facilities
Term Contract
Post-Bid
Goldsboro, NC

Construction Materials Testing and Special Inspections Services
Infrastructure
Results
$9,500,000 est. value
Hendersonville, NC

Last Updated 08/19/2022 06:02 PM
Project Title

RFQ - Conduct a Stormwater Management Study

Physical Address View project details and contacts
City, State (County) Duck, NC 27949   (Dare County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Duck, North Carolina is requesting qualifications be submitted from professional engineering consulting firms to complete a stormwater management study addressing recurring flooding issues in five basins affecting neighborhood streets and properties. The Town expects the firm hired to have considerable knowledge and experience in the areas of coastal flooding and stormwater management, particularly in the Outer Banks/Albemarle region. Any firm submitting a proposal for consideration must include a demonstrated ability to complete projects within targeted time frames and budgetary constraints. Negotiation of a fixed rate or ceiling of costs for services will be conducted. Questions about the RFQ content or project should be emailed to Director of Community Development Joe Heard at jheard@townofduck.com AND Senior Planner Sandy Cross at scross@townofduck.com.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents