Similar Projects
Governors Office of Storm Recovery, Bowman Avenue Dam, Bowman Pond Clearing at Suny Purchase
Infrastructure
Bidding
$425,000 to $475,000 est. value
Purchase, Rye Brook, NY 10577

OJC Big Air Modifications Project
New Construction
Bidding
Lake Placid, NY 12946

Public Works Materials
Term Contract
Post-Bid
Fonda, NY 12068

County Route 16 (North Quaker Lane) Road Improvement
Post-Bid
Poughkeepsie, NY 12601

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

West River Shoreline Habitat Restoration
Infrastructure
Bidding
$625,316 to $859,809 est. value
Grand Island, NY 14072

Drainage Pipe Plain and Galvanized Steel
Post-Bid
Troy, NY 12180

Precast Reinforced Three Sided Box Culvert for Replacement of Maple Glen Bridge
Results
Goshen, NY 10924

Round Corrugated Plastic Pipe
Post-Bid
NY

County Route 17 Culvert Replacements (3)
Results
Canton, NY 13617

On-Call Emergency Repair Services for Department of Public Works, Water and Sewer Departments
Term Contract
Post-Bid
Rensselaer, NY 12144

Lauderdale Drainage and Waterproofing
Results
Geneseo, NY 14454

Drainage Boom
Post-Bid
White Plains, NY 10601

Otsquago Creek Stabilization
Results
Less than $500,000 est. value
Fort Plain, NY 13339

Reported 07/24/2021 12:00 AM
Project Title

Stormwater Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Ballston Spa, NY 12020   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of the following work: This project includes site improvements along Saratoga Avenue in the Village of Ballston Spa, between Union Street and North High Street. Site improvements include several catch basin replacements, storm pipe replacement and realignment, a sanitary manhole installation, asphalt paving and site restoration. Restoration includes a section of concrete curb replacement, sidewalk repairs and grassed area restoration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents