Similar Projects
Last Updated | 01/26/2023 11:36 PM |
Project Title | Greenwood High School Bid Group 1 -Turf Fields and New Road Construction |
Physical Address | View project details and contacts |
City, State (County) | Bowling Green, KY 42104 (Warren County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Park/Playground, Paving/Reconstruction, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,800,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Alliance Corporation is the Construction Manager for this project, acting as agent for the Owner and acting in the Owner's behalf in soliciting your proposal. Each successful Bidder shall execute a Contract directly with the Owner and not with the Construction Manager. Each Proposal shall be accompanied by a certified check, cash, or bidders bond, executed by the Bidder and Surety Company, IN THE SUM OF NOT LESS THAN FIVE PERCENT (5%) OF THE AMOUNT OF THE BASE PROPOSAL The bid security is required as a guarantee that if the Proposal is accepted a Contract will be immediately entered into and the performance of it properly secured. Proposal Forms must be properly filled out. No qualifying letters or statements will be considered. No bidder may withdraw a Bid submitted for a period of sixty (60) days after the date set for the opening of Bids. In the event the Bidder to whom the Contract is awarded fails to execute a satisfactory Contract and Bond, he shall be eliminated and shall forfeit his certified check, cash or his Bid bond and shall be liable for the loss occasioned by the owner by such failure. Any Bid which is not received on a timely basis or in the proper form shall be returned unopened. There are major material items within the various Bid Packages, which will be bid through the respective Contractor but purchased direct by the Owner. Interested material suppliers should contact the Construction Manager (Alliance Corporation) for the names of contractors who have expressed an interest in the Bid Packages involved. BID PACKAGE 010 - EARTHWORK BID PACKAGE 020 - HOT MIXED ASPHALT PAVING BID PACKAGE 030 - GENERAL TRADES BID PACKAGE 260 -- ELECTRICAL This is not a prevailing wage project. The overall Project consists of Greenwood High School Bid Group 1 - Turf Fields & New Road Construction |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |