Similar Projects
Transportation Facility Development DAEP Facility Renovations - Foundation and Area Paving
Infrastructure
Bidding
Ennis, TX

US 281 - Surfacing/Roadway Restoration
Infrastructure
Bidding
$2,288,668 est. value
TX

Paving and Markings Services
Term Contract
Post-Bid
Lufkin, TX 75902

Castle Hills Tract K Phase 2 Commercial Development Earthwork, Utilities and Paving
Post-Bid
Lewisville, TX 75028

MFR Water Treatment Plant Roadway Rehabilitation and Extension
Results
Less than $195,375 est. value
Harlingen, TX 78550

Hazard Elimination and Safety
Results
Less than $3,772,972 est. value
TX

Kelcy Way Road Improvement
Infrastructure
Bidding
Early, TX

Liberty Trails, Phase 3 - Paving Improvements
Post-Bid
TX 76100

DNT Frontage Road from FM 428 to Grayson County Line
Results
$18,986,710 est. value
Pilot Point, TX 75258

East Loop Phase II - FM 730 to US 180
Infrastructure
Bidding
Weatherford, TX

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Post-Bid
TX

2021 Street Rehabilitation Task Order Contract Package 1 Project
Results
Less than $5,000,000 est. value
San Antonio, TX 78205

2021 Street Improvement
Post-Bid
Argyle, TX

Paving Improvements for the Laurel and Bartlett Neighborhoods Phase 1 in Light Farms
Results
Celina, TX 75009

2021 Street Reconstruction Projects
Post-Bid
Aubrey, TX

Last Updated 12/22/2021 11:58 AM
Project Title

Road Repair - West Carlsbad Loop

Physical Address View project details and contacts
City, State (County) Carlsbad, TX 76934   (Tom Green County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to provide repair and hot mix overlay of a section of W. Carlsbad Loop between U.S. 87 North and Burma Road to the County.The scope of services requested in this RFB includes the items listed below: Add 4’ in width to the west side of W. Carlsbad loop by approximately 300’ in length from US 87 to two lane portion of W. Carlsbad Loop (making this section approximately 40’ wide) (See Attachment 3 – Intersection Map). Cut out existing material to allow for a minimum of 8” of compacted base. Add minimum of 8” compacted base material. Hot mix to same level as road per TXDOT specs . Remove existing striping and restripe to three equal lanes (approx. 13’ wide). From 300’ taper to 500’ both sides of road in to existing two-lane. Three (3) inch thick overlay (overlay of existing pavement) of TXDOT Super Pave Type B hot mix, match existing roadway width (approximately 22’) and taper edges. Tie to existing paving grade by tapering an extended length of 150’ (feet) from the 3” overlay down to current grade. Approximately .9 miles from U.S. Hwy 87 on W. Carlsbad Loop (See Attachment 2) ties into existing hot mix. No Backfilling or milling is required. Thermal pavement stripping/markings to be installed per TXDOT specs. Approximately 2.2 miles – from US 87 to Turner Rd. (approx. 1.1 of W. Carlsbad Loop and 1.1 miles of Burma Rd.). See Attachment 2 for map of location. Responsible for Dig Test prior to any excavation. Traffic control during project. One lane of travel must remain open at all times.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents