Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Upgrade Mechanical Systems
Bidding
Less than $250,000 est. value
River Grove, IL 60171

MVCC Building H Natatorium RTU Replacement
Bidding
Tinley Park, IL

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

Des Plaines HVAC Improvements
Bidding
Des Plaines, IL

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 11/13/2020 04:12 PM
Project Title

HVAC Systems at Specific Facilities - Design/Build

Physical Address View project details and contacts
City, State (County) Northbrook, IL 60062   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award/Bid No. 1 = Fire Station 11 Contract Award/Bid No. 2 = Crestwood Place and Police Station Site 1: Fire Station 11 located at 740 Dundee Avenue. Site 2: Crestwood Place, 1000 Waukegan Road. Site 3: Police Department, 1401 Landwehr Road. Recalculate building load needs using current loads such as the current employee count, electronics, equipment layout, windows, future LED lighting and other pertinent factors noted in a standard Manual-N load calculation. Size unit to meet the calculated load. The new open protocol, non-proprietary BAS shall be BACnet. We are open to a cloud-hosted system (assuming the Village owns the data and will be provided the data in its entirety with no penalty or charge when the contract ends), or an on-premise system. BAS must be secure and able to be accessed remotely. Contractor will coordinate software installation with Village staff. All cable connections to new HVAC systems to Village servers will be supplied and installed by others. Contractor will supply Village with location and number of connections required with bid. Provide a basic design with the location and number of Northbrook network connections. Set up energy efficient operational strategies that include but are not limited to: Incorporate VFD’s, Incorporate CO2 monitoring and air pressure regulation, Optimal start/stop, BAS, RTU, and VAV boxes shall be able to be adjusted in .5 degree increments., A means for onsite staff to start up the RTU system for two hours at a time without the use of the BAS. Unit will have a point allowing connection to the fire alarm panel (for shutdown) in the future. Include curbs and/or curb adapters for the new RTU. Testing and Balancing of all areas served by the new system. Contractor to install all new low voltage control wiring for VAV boxes and BAS. Include shielded wiring if required for proper installation. Set up local Thermostats with a 1.5 degree end user plus-minus adjustment. Set up the Facilities Manager with the ability to override local commands through the BAS. System shall also be capable of maintaining employee comfort. If Option 2 is accepted follow installation specifications listed under the Police Department Server Room that apply.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents