Similar Projects
Clintonville - Lewisburg
Infrastructure
Design
$1,700,000 CJ est. value
Crawley, WV 24931

Clintonville - Lewisburg
Infrastructure
Design
$1,700,000 CJ est. value
Crawley, WV 24931

Howards Crk Hike/Bike Trl & Ped Br
Infrastructure
Bidding
$380,000 CJ est. value
Rupert, WV 25984

Howards Crk Hike/Bike Trl & Ped Br
Infrastructure
Bidding
$380,000 CJ est. value
Rupert, WV 25984

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Lewisburg L&R Rail Trail
Infrastructure
Design
$452,250 CJ est. value
Rupert, WV 25984

Replacing Existing Storm Drainpipes and Drop Inlets
Infrastructure
Bidding
$8,000,000 CJ est. value
Ronceverte, WV 24970

Paving Project 2
Infrastructure
Post-Bid
Ronceverte, WV

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

GAOA Lake Sherwood Phase 2
Term Contract, Demolition, New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
White Sulphur Springs, WV 24986

Greenworks Recycling Concrete Work
Infrastructure
Bidding
$300,000 CJ est. value
Ronceverte, WV 24970

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Last Updated 01/31/2023 02:32 AM
Project Title

Tunnel Br

Physical Address View project details and contacts
City, State (County) Lewisburg, WV 24901   (Greenbrier County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $11,820,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0644233DBC Type of Work : Replace Bridge As of January 31, 2023, the project is in Final planning status. The funding obligation date for the construction is April 28, 2023. WVDOT - Tunnel Br *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents