Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Last Updated 01/16/2023 05:31 PM
Project Title

Downtown Corridors Bicycle and Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Concord, CA 94520   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,546,190 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done in general consists of mobilization, traffic control, erosion and sedimentation control, potholing of existing utilities, clearing and grubbing, tree trimming, tree removal, landscape and bioretention area installation, catch basin and storm drain pipe installation, sidewalk, driveway, curb and gutter, valley gutter, curb ramp installation, decorative concrete and performed thermoplastic crosswalk installation, signing, traffic striping and markings, flex-post delineators, lighting system, rectangular rapid flashing beacon, traffic signal modification, cold-in-place recycling, overlay and crack sealing, HMA base repairs, and all other work as specified in these Special Provisions and shown in the Drawings. The estimated base construction cost for the project is approximately $3.5 million. The Additive Bid 1 cost is approximately $65,000. The Additive Bid 2 cost is approximately $155,000. The Additive Bid 3 cost is approximately $77,000. The bidder's attention is directed to the "Project Stabilization Agreement," section of the special provisions regarding the requirement to enter into a Project Stabilization Agreement ("PSA") for City construction projects funded in whole or in part with City of Concord funds where the engineer's estimate or bid amount exceeds $750,000.00. The PSA also includes a Helmets to Hardhats requirement. A copy of the PSA is attached and incorporated by reference. The Contractor shall possess a valid Contractor's licenses at the time the bids are opened: Class "A," General Engineering Contractor. Further, only a contractor registered with the Department of Industrial Relations (DIR) to bid on public works contracts in California shall be permitted to submit a bid. Furthermore, only subcontractors registered with the DIR to bid on public works contracts in California shall be permitted to perform work or labor or render service under subcontract to the subject contractor. The Contractor shall have completed within the last five years a minimum of three Capital Improvement Program (CIP) projects for one or more public agencies; these projects shall involve work of similar type and complexity, each project at not less than $2,000,000. There is no pre-bid meeting for this work; however, contractors are strongly encouraged to visit all sites in advance of the bid to familiarize themselves with the nature of the existing conditions. The City Council has ascertained that State of California prevailing wage rates are applicable for this and all City projects. The Contractor may elect to receive 100% of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code and with applicable City regulations. ALL BIDS SHALL BE PRESENTED UNDER SEALED COVER AND SHALL BE ACCOMPANIED BY CASH, CASHIER'S OR CERTIFIED CHECK OR A BIDDER'S BOND EXECUTED BY A CORPORATE SURETY INSURER. THE BIDDER'S GUARANTEE SHALL BE IN AN AMOUNT EQUAL TO AT LEAST TEN PERCENT (10%) OF THE AMOUNT BID AND MADE PAYABLE TO THE CITY OF CONCORD. For information regarding the project, contact Tianjun Cao, P.E., Associate Civil Engineer, at Tianjun.Cao@cityofconcord.org. Completion Date: Substantial Completion: 130 Working Days Final Completion: 30 days from substantial completion day Liquidated Damage: $4800 per calendar days

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents