Similar Projects
15th Street (Summit to Dakota) - City of Yankton
Infrastructure
Conception
$1,374,000 CJ est. value
Yankton, SD 57078

15th Street (Summit to Dakota) - City of Yankton
Infrastructure
Conception
$1,374,000 CJ est. value
Yankton, SD 57078

Shoulder Widening, AC Resurfacing, Modify Intersection, ADA, End Blocks
Infrastructure
Design
$10,372,000 CJ est. value
Yankton, SD 57078

Shoulder Widening, AC Resurfacing, Modify Intersection, ADA, End Blocks
Infrastructure
Design
$10,372,000 CJ est. value
Yankton, SD 57078

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

YMS Sidewalk Installation – 20th Street/Burleigh Street/21st Street
Infrastructure
Results
Yankton, SD

21st (Summit to Wclr) - City of Yankton
Infrastructure
Conception
$300,000 CJ est. value
Yankton, SD 57078

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Highway 52 Bike Path Asphalt Overlay
Infrastructure
Results
Yankton, SD 57078

Summit Street ( 8th to 9th ) - City of Yankton
Infrastructure
Conception
$300,000 CJ est. value
Yankton, SD 57078

Highway 52 Water Main Relocation
Infrastructure
Post-Bid
$511,000 est. value
Yankton, SD 57078

Grading (1.5M CuYd), Interim Surfacing, Replace Structure RCBC
Infrastructure
Results
SD

Cedar Street (4th to 8th ) - City of Yankton
Infrastructure
Conception
$450,000 CJ est. value
Yankton, SD 57078

Last Updated 01/12/2023 12:19 PM
Project Title

Whiting Drive From (Ferdig Street to 13th Street) - City of Yankton

Physical Address View project details and contacts
City, State (County) Yankton, SD 57078   (Yankton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope is expected to be released on a future date. This project is included in the City of Yankton's FY 2022 Capital Improvement Plan (CIP). As of January 12, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents