Last Updated | 03/21/2023 10:46 AM |
Project Title | 1st Floor Remodel/Fire Sprinkler System - GEB Building |
Physical Address | View project details and contacts |
City, State (County) | Overland Park, KS 66210 (Johnson County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,941,996 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Johnson County Community College is soliciting bids for the renovation of the 1st Floor and a new fire suppression sprinkler system that will be added (on all three levels and penthouse) in the General Education Building (GEB) on the JCCC main campus. The existing building is a 3 story concrete structure. Exterior walls are brick on metal stud walls. Existing interior walls are generally 3 5/8" or 6" metal stud to structure with gyp sheathing to 6" above ceiling creating an open plenum return air system. Interior renovation of first floor will see renovation existing office suites into new space for student services on the first floor of the General Education Building (GEB). A New Fire Suppression sprinkler system will be added throughout the GEB on all three levels and penthouse. Project will be constructed under a single prime contract. Project area is separated into Phase 1 and Phase 2 work. 5 alternates are to be include all within phase 2. Reference drawings for defined scopes of alternates. The College intends to contract for the interior renovation of first floor existing office suites into new space for student services in the General Education Building (GEB) on the JCCC main campus. In addition, a new fire suppression sprinkler system will be added throughout the GEB on all three levels and penthouse. Project will be constructed under a single prime contract. Project area is separated into Phase 1 and Phase 2 work. There are five (5) alternates that are to be included within phase 2. CLARIFICATION DEADLINE 2/7/2023 5:00 PM |
||||||||||||||||||||||||||||||||||||||
Details | 3 Stories Above Grade, Remodeling, Remodeling.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |