Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Effluent Channel and Kickapoo Interceptor Control Structures
Renovation
Bidding
Peoria, IL 61605

WWTP Improvements 2021
New Construction
Bidding
Coal City, IL 60416

2020 Aluminum Procurement
Term Contract
Post-Bid
Plainfield, IL 60544

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

WWTF - 2020 Raw Sewage Pump Replacement
Results
Plainfield, IL 60544

Primary Clarifier Flights Replacement
Results
Geneva, IL 60134

East Water Reclamation Facility Phosphorus Removal Upgrades Contract 2-2021
Renovation
Bidding
Crest Hill, IL 60403

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

Harvard WWTF Improvements - Phase 1A
Results
Harvard, IL 60033

WWTP Repairs - Aerobic Digester Rehabilitation
New Construction
Bidding
Rockton, IL 61072

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

2018 WWTP Improvements
Results
Less than $4,710,000 est. value
Belvidere, IL 61008

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Single Stage Vertical Turbine Pump Rebuild
Results
Addison, IL 60101

Last Updated 11/22/2021 10:07 AM
Project Title

Wastewater Treatment Facility Biosolids Management Improvement

Physical Address View project details and contacts
City, State (County) Marengo, IL 60152   (McHenry County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of construction of sludge stabilization process known as BCR CleanB will be installed in the existing Boiler Room in the Solids Handling Building. The side walls of the Boiler Room will need to be removed, and the ceiling will need to be beam-supported. Two (2) chemical storage tanks provided by BCR will be placed on the ground floor, as shown on the plans, with bulk fill piping on the east side of the Solids Handling Building. Two (2) new WAS feed rotary lobe pumps will be installed in the existing Pump Room. Existing electrical infrastructure will be used to power all new motors. Sludge will be pumped from the existing day tank to the CleanB contact coil using the new pumps and new process piping. From there, new process piping will convey the wastewater to the existing centrifuge.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents