Similar Projects
Pike Freshman Center Walk-In Freezer
Bidding
Indianapolis, IN

Upgrades of PTAC Units in University Apartments Unit 3
Bidding
Less than $250,000 est. value
Terre Haute, IN 47803

Purdue University Veterinary Medicine Teaching Hospitals-Mechanical
Post-Bid
Lafayette, IN 47907

Warren Village HVAC Improvements
Post-Bid
Terre Haute, IN 47804

IN145 Service Building AHU-3 Controls
Results
Indianapolis, IN 46202

Bl580 IIDC-Chiller Replacement
Results
Bloomington, IN 47408

Monitoring and Replacement of Filters
Term Contract
Bidding
Indianapolis, Noblesville, IN 46208

Jordan Hall HVAC 14 Upgrade
Post-Bid
Bloomington, IN 47408

Phase 2 - Mini Splits HVAC Equipment Replacement at Meadow Wood Apartments
Results
$120,000 to $130,000 est. value
Charlestown, IN 47111

Scattered Sites HVAC Replacements - Phase 1
Bidding
Elkhart, IN

Building Automation and Temperature Control
Post-Bid
Less than $150,000 est. value
Richmond, IN 47374

North Ventilation System Replacement
Results
Less than $150,000 est. value
Edinburgh, IN 46124

HVAC Upgrades
Bidding
Mishawaka, IN 46545

CWD Chiller Replacement
Post-Bid
Terre Haute, IN 47802

IN076 ICTC-HVAC-Mechanical Repairs
Results
Bloomington, IN 47408

Reported 05/01/2021 12:00 AM
Project Title

2021 Castle High School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Boonville, IN   (Warrick County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: HVAC re-placements in three areas of Castle High School as follows: Replace AHU-6 (Main Office), Remove and replace AHU-6 servicing the Main Office. The new AHU-6 (owner provided) will be up-sized to include servicing the Principal's Office, two Conference Rooms, & Kitchenette Area that are currently serviced by AHU-1 VAV induction terminals. Replace AHU-1 First Floor VAV Induction Terminals. Remove and replace all AHU-1 first floor VAV induction terminals with electric reheat (quantity of approximately 46) with new parallel fan-powered VAV terminals with electric reheat. Replace HVAC System in the Main Gym. Remove 14 existing heat only AHU and eight existing relief louvers and replace with two 60 ton packaged DX rooftop units(owner provided) with electric heat. Provide new double-wall painted flat oval ductwork, grilles & diffusers. Rework existing power feeds to new HVAC units and install duct detector fire alarm wiring. Reinforce existing roof structure and infill upper level floor where ductwork was removed. Infill 20 exterior wall openings with 1” insulated glass. Replace existing split-system in Trainer's Office.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents