Similar Projects
City Tower Mixed Use
New Construction
Conception
$55,000,000 est. value
Grand Rapids, MI 49503

City Center Office Plaza
New Construction - 19,723 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Novi, MI 48375

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Neland Avenue Church
Addition, Demolition
Design
Grand Rapids, MI 49507

Vanguard Research & Development Campus: Flex-Tech Building
New Construction, Demolition - 130,300 SF
Post-Bid
$57,000,000 est. value
Ann Arbor, MI 48104

St. Francis of Assisi - Addition
Renovation, Addition - 14,500 SF
Post-Bid
Ann Arbor, MI 48104

Office Addition and Renovation
Renovation, Addition - 1,150 SF
Results
Escanaba, MI 49829

DPW Office Improvement Project
Results
Berkley, MI 48072

Book Tower & Book Building Redevelopment
Renovation - 517,000 SF
Construction
$313,000,000 est. value
Detroit, MI 48226

Griffin Project - Mixed Use Development
New Construction - 117,347 SF
Construction
$65,000,000 est. value
Royal Oak, MI 48067

Camp Bow Wow - New Facility
New Construction - 6,800 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Norton Shores, MI 49444

Office Building - Addition
Addition - 9,000 SF
Pending Verification
Warren, MI 48089

Selden Street Shared Artist Studio and Offices
Renovation - 110,000 SF
Design
Detroit, MI 48201

Office Improvements
Renovation
Post-Bid
Marquette, MI 49855

Chippewa County - Sheriff Office Addition
Addition
Results
Sault Sainte Marie, MI 49783

Last Updated 06/21/2022 11:23 AM
Project Title

American Muslim Diversity Association: Expansion

Physical Address View project details and contacts
City, State (County) Sterling Heights, MI 48314   (Macomb County)
Category(s) Commercial, Entertainment/Recreation, Religious/Funeral
Sub-Category(s) Fitness Center, Office, Religious Facility
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $4,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Expansion of an existing place of worship to include additional prayer area, gymnasium, multipurpose area, offices, along with other ancillary religious services. Demolition, site work, paving and addition to a mixed-use development in Sterling Heights, Michigan. Working plans call for the addition of a 13,348-square-foot, three-story above grade religious / funeral development; fitness / recreation center; and office development. As of June 17, 2022, this project will be submitted for permitting soon. An architect has been selected. This project is expected to bid exclusively to invited general contractors in the third quarter of 2022. A timeline for construction has yet to be announced.

Details

Office, Addition, Fitness Center, Addition, Religious Facility, 3 Stories Above Grade, 13,348 SF Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Rugs and Mats, Fixed Audience Seating, Pews and Benches.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents