Similar Projects
Supply and Install Two 3-ton Fujitsu Mini Split Heat Pumps with Wall Mounted Air Handlers at C. Wayne Collier Elementary School
Alteration
Bidding
$30,000 est. value
Hope Mills, NC 28348

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

Bay & Hangar Door Maintenance, Repair, and Replacement (Fort Bragg, NC)
Results
Fort Bragg, NC 28310

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

C Wayne Collier Cafeteria A/C Replacement
Results
Fayetteville, NC 28305

College Lakes Package AC Replacements for Buildings 2,3 and 5
Alteration
Post-Bid
Fayetteville, NC 28311

71st High Room 922 A/C replacement
Results
Fayetteville, NC 28304

Morganton Road Elementary Office and Cafe AC Replacements
Alteration
Post-Bid
$2,000 to $30,000 est. value
Fayetteville, NC 28303

Reid Ross Classical, Orchestra and Dance Rooms AC Replacement
Results
Fayetteville, NC 28311

Crown Boiler Retubing and Burner Upgrade
Infrastructure
Post-Bid
Fayetteville, NC 28306

Howard Hall Elementary, Media Center AC Replacement
Results
Fayetteville, NC 28311

Jack Britt High School Chiller Replacement
Alteration
Post-Bid
Fayetteville, NC 28306

Cape Fear High School, Administration Area AC Replacement
Results
Fayetteville, NC 28312

Last Updated 05/11/2022 01:28 PM
Project Title

Gray's Creek Elementary School HVAC and Window Replacement

Physical Address View project details and contacts
City, State (County) Hope Mills, NC 28348   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of replacing a variety of DX HVAC equipment including wall mounted heat pumps, packaged rooftop units, and split system units on campus. Existing single pane windows in Buildings 1, 2, and 3 shall be replaced with new.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents