Similar Projects
Canterbury Furnaces
Alteration
Bidding
Salt Lake City, UT

DFCM Construction-Pre Qualified Mechanical-Udot Rampton MTF Building AHU and Unit Heaters
Alteration
Bidding
$771,000 est. value
West Valley City, UT 84119

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Kanab Center Foundation Venting
Post-Bid
Kanab, UT 84741

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

HVAC Preventative Maintenance and Repair Services
Results
Salt Lake City, UT 84111

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Bidding
Salt Lake City, UT

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

Fashion Square Condenser Pump Replacement
Results
Less than $180,000 est. value
Murray, UT 84107

DINO-Housing HVAC Installation
Term Contract
Bidding
Yampa, CO - Green River, UT

Department of Labor - Combustible Dust Chambers
Post-Bid
Sandy, UT

UNG North Salt Lake Armory RTU Units Replace
Results
Less than $280,000 est. value
Salt Lake City, UT 84129

DSU - Taylor Dental Chiller Project
Alteration
Bidding
Saint George, UT

Biology Building Fume Hood Upgrade
Post-Bid
Salt Lake City, UT 84112

HVAC Maintenance Services
Term Contract
Results
Sandy, UT

Last Updated 12/15/2021 07:55 AM
Project Title

DFCM Construction-Snow College Sevier Valley Center Chillers Replacement

Physical Address View project details and contacts
City, State (County) Richfield, UT 84701   (Sevier County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing the two large chillers, Pumps, VFD’s to the air handlers, and air separator for the Sevier Valley Center. The Base Bid for this Project will include all labor, materials, etc. The Work consists of the following: 1. The Work includes: a. Remove and replace 2 air cooled chillers. b. Remove and replace chilled water pumps. c. Remove and replace VFDs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents