Similar Projects
Brentwood Park Storm Sewer and Creek Bank Project
Infrastructure
Bidding
$200,000 est. value
Brentwood, MO

Deer Creek Greenway - Deer Creek Park Streambank Stabilization
Infrastructure
Post-Bid
Maplewood, MO

Mississippi Greenway - LKS Flood Repairs
Infrastructure
Post-Bid

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

West Hangar Drainage Improvements
Results
Chesterfield, MO 63005

Beverly Avenue and Halcyon Drive Improvements
Infrastructure
Post-Bid
Glendale, MO 63122

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Fee Fee Road Ballfields Culvert Replacement
Infrastructure
Post-Bid
Maryland Heights, MO

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Reco Avenue Bank Stabilization
Infrastructure
Post-Bid
$301,000 est. value
Crestwood, MO 63126

Stream Bank Restoration Phase II
Infrastructure, Alteration
Results
Ballwin, MO 63021

City Hall Drainage Improvements
Infrastructure
Post-Bid
$200,000 est. value
Kirkwood, MO 63122

Aubuchon Road Culvert Repair
Infrastructure
Results
MO

Lone Elk Park Lake Repair
Infrastructure
Results
Valley Park, MO 63088

Lockwood Culvert C-4-224
Infrastructure
Results
MO 32812

Last Updated 04/26/2022 06:10 AM
Project Title

Sinkholes Remediation

Physical Address View project details and contacts
City, State (County) Bella Villa, MO 63125   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Jefferson Barracks National Cemetery - Sinkhole Remediation: Contractor shall provide all Management, Supervision, Labor, Material, Parts and Equipment necessary for Sinkholes Remediation at the Jefferson Barracks National Cemetery. The work shall include but will not be limited to the repair of specific Sinkholes.

Details

Division 02 - Existing Conditions, Sinkhole Remediation, Sinkhole Remediation by Grouting, Sinkhole Remediation by Compaction Grouting, Sinkhole Remediation by Cap Grouting, Sinkhole Remediation by Backfilling.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents